This paper presents the lateral vibration experiment of two shaft system plants on a shafting test bed.
在船舶轴系试验台上对两种轴系布置方案进行了轴系横向振动实验。
Vibration experiment indicates that the optimum time of vibration is 12 s. Finally, the paper also points out some tips and quality controlling strategies in those key construction techniques.
在其它施工关键技术方面,针对施工中的难点问题,结合实际工程,提出了相关的施工工艺、注意事宜以及质量控制措施。
Vibration experiment indicates that the optimum time of vibration is 12 s. Finally, the paper also points out some tips and quality controlling strategies in those key construction techniques.
在其它施工关键技术方面,针对施工中的难点问题,结合实际工程,提出了相关的施工工艺、注意事宜以及质量控制措施。
应用推荐