• The electrovalence at the period of time is to reflect costing better, and it can not only offers one way for peak shifting and valley filling but also save electric power at peak power time.

    分时电价是为了更好的反映成本,并提供一种鼓励移峰填谷的手段,同时在峰荷时段还可节约电能。

    youdao

  • A control technology based on trend analysis and fuzzy theory was presented and its application in peak clipping, valley filling and maximum demand control area of the power network was introduced.

    介绍了一种基于趋势分析和模糊理论的控制技术在电网削峰填谷、最大需量控制领域的应用,简述了其控制工作原理、运行规则和系统组成。

    youdao

  • Static benefits are generated from peaking and valley-filling, which are further divided into capacity benefits and coal saving benefits.

    静态效益即调峰填谷所产生的效益,它进一步分为容量效益和电量效益(节煤效益);

    youdao

  • Static benefits are generated from peaking and valley-filling, which are further divided into capacity benefits and coal saving benefits.

    静态效益即调峰填谷所产生的效益,它进一步分为容量效益和电量效益(节煤效益);

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定