• If longer lengths of straight run are available, position the mounting such that 80% of the run is upstream and 20% is downstream.

    如果可以弄到更长的垂直导压管,就定位安装座,将80%上行、20%下行。

    youdao

  • If longer lengths of straight run are available, position the mounting such that 80% of the run is upstream and 20% is downstream.

    如果可以弄到更长的垂直导压管,就定位安装座,将80%上行、20%下行。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定