-
The scheme number three is: a connection rod (12) is hinged between the lower lever (5) and the upper lever (7).
方案三是:下杠杆(5)与上杠杆(7)之间铰接有连杆(12)。
youdao
-
The scheme number three is: a connection rod (12) is hinged between the lower lever (5) and the upper lever (7).
方案三是:下杠杆(5)与上杠杆(7)之间铰接有连杆(12)。
youdao