• The design control conditions are uplift displacement or uplift load to spread foundation of bearing uplift load.

    承受上拔荷载的扩展基础,可以用上拔位移或上拔荷载作为设计控制条件。

    youdao

  • The direct or indirect method to determine ultimate uplift load of anchored rod pile is proposed herein based on field tests in association with engineering practice.

    本文结合工程实践,通过现场试验分析研究提出锚杆桩抗拔极限荷载直接或间接的确定方法,并提出了合理的施工方案。

    youdao

  • The reinforcement scheme which add tension piles and shear walls in the garage was put forward. The calculation results show that the uplift load of the pile greatly reduced after adding shear walls.

    提出了在地下车库内增设抗拔桩和剪力墙的加固方案,计算结果显示,增设剪力墙后桩基所受上拔力大幅度降低。

    youdao

  • The reinforcement scheme which add tension piles and shear walls in the garage was put forward. The calculation results show that the uplift load of the pile greatly reduced after adding shear walls.

    提出了在地下车库内增设抗拔桩和剪力墙的加固方案,计算结果显示,增设剪力墙后桩基所受上拔力大幅度降低。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定