This paper introduces the waterwall features and start-up procedure of domestic 600mw supercritical variable pressure operating once through boiler under development.
文中介绍正在研制的国产600MW超临界变压运行直流锅炉水冷壁结构特点和启动过程。
This paper points out the drawbacks of conventional start-up procedure for small calcium carbide furnace after major repair and presents the advantages of improved procedure and its theoretical basis.
文中指出了小型电石炉大修后用传统方法开炉的弊端,介绍了改进后的开炉方法的优点及其理论根据。
Compressors are run up with the anti surge valve fully open. This valve is forced to remain open, independently of the control system, until the run-up PROCEDURE has been concluded.
压缩机升速时防喘振阀全开,该阀不受控制系统控制而被强制保持打开直到升速阶段完成。
Compressors are run up with the anti surge valve fully open. This valve is forced to remain open, independently of the control system, until the run-up PROCEDURE has been concluded.
压缩机升速时防喘振阀全开,该阀不受控制系统控制而被强制保持打开直到升速阶段完成。
应用推荐