Real flue gas is made up of nitrogen oxide (NOx), nitrogen, and oxygen as well as CO2, Peter tells me.
'真正的烟气是由氮氧化物(NOx)、氮、氧以及二氧化碳组成,'彼得介绍说。
If the flue overdraws, all the heat goes right up the chimney.
如果风管抽风过度的话,热量就会从烟囱直接跑掉了。
Defending freezing system is to prevent to import net wall to go up in the flue of inert segregator frozen.
防冰冻系统是防止在惰性分离器的烟道进口网壁上结冰。
Flue gas can also beset up waste heat recovery system to increase the thermal efficiency of furnace.
也可以设置烟气余热回收系统来提高加热炉的热效率。
The furnace chamber has flue next to activation path which were built up with special firebrick.
炉芯包括内烟道和活化道,用特异型耐火砖堆砌组装而成。
Triple coil structure is adopted for the boiler with three-pass smoke and flue, compact design and energy-saving space. The air pre-heater is added to enhance the heating efficiency up to 92% or more.
锅炉采用三盘管结构,烟气三回程,设计紧凑,节能空间,增加空气预热器时热效率最高可达92%以上。
Under the best operating mode condition, flue gas desulphurization efficiency can be up 80%, which proves that the three-dimensional electrode system has better desulphurization performance.
在最佳条件下,烟气脱硫效率能达到80%以上,说明三维电极体系有较好的脱硫性能。
Please adjust attemperator and flue gas damper to increase steam temperature up as soon as possible.
请尽快调节减温器和烟气挡板把蒸汽温度升高。
The tectorial filter material is a new kind of filter material and it makes up the defects of the traditional filter materials in the process of flue dust treatment.
覆膜滤料是新型的过滤材料,弥补了普通滤料在烟尘处理过程中的不足。
Exit flue gas temperature, flue gas quantity and length of flue gas jet could be control conveniently according to requirement of the boiler start up process.
用到循环流化床锅炉启动,可以任意调整出口烟气温度、出口烟气射流长度。
FGD (flue gas desulphuration) gypsum-fly ash binder making up of FGD gypsum and fly ash mainly is one of the gypsum-based materials.
脱硫石膏粉煤灰胶结材是指以脱硫石膏和粉煤灰为基本组分的一种石膏基材料。
As sulphur dioxide emission from power industry made up 45 percent of national total in 2003, it is an urgency to speed up the flue duct desulphurization in the power industry.
2003年我国电力工业二氧化硫排放占到我国二氧化硫排放总量的45%,因此,电力工业烟气脱硫迫在眉睫。
As viewed from water recycle and its recycle ratio, safety of flue gas cooler was discussed. That the very first 5 days after start up its the dangerous period.
主要从水循环和循环倍率的角度,谈高温取热炉的安全性,并特别强调开工5天内是高温取热炉的危险期。
Since the energy recovery technology in FCC has began to develop and apply in the middle period of 70's, 60 sets of flue gas turbine have been operated up to now.
催化裂化装置能量回收技术自70年代中期开始开发、应用,至今已有60余台套机组投入运行。
Flue gas-air tube heat exchanger is designed and made, its test-bed system is put up, and the thermal property and resistance characteristic of air side are studied.
设计并制作了管式烟气-空气热交换器,搭建了试验台系统,进行热工性能和空气侧阻力特性的研究。
A whirl of sparkles leaped up the flue.
旋转的火花窜出烟囱。
The technology flue gas desulfurization (FGD) in coal-fired coal power plants is summed up in this paper.
对燃煤电厂烟气脱硫进行了综述,提出采用回收法脱硫是具有很大发展潜力的烟气脱硫方法。
The experiments on the start-up of the biotrickling filter and the desulfurization of flue gas were conducted.
进行了生物膜填料塔挂膜启动及烟气脱硫实验研究。
The experiments on the start-up of the biotrickling filter and the desulfurization of flue gas were conducted.
进行了生物膜填料塔挂膜启动及烟气脱硫实验研究。
应用推荐