• Every time a programmer runs the build process and has a successful code compile, a run of all the applicable unit tests should follow.

    程序员每次运行构建流程成功编译代码时,遵循所有应用单元测试

    youdao

  • Because these tests take longer to run than true unit tests, you may find that you can't run them all the time.

    由于这些测试真正单元测试运行时间长,因而不能一直运行它们

    youdao

  • This notion of run-time scope as a strict set of mutually referable classes is captured in JPA 1.0 as a persistence unit.

    现在严格相互引用称为运行时作用域,而JPA 1.0 中称为 持久化单元

    youdao

  • Then, you can use the XML to SQL wizard to unit test the XML document for validity before writing your code that will use the XMLToSQL run time library.

    同时也可以编写使用XMLToSQL运行代码之前通过XMLToSQL向导进行XML文档单元测试

    youdao

  • At the same time, a dedicated unit test Explorer window lets you see the structure of your unit tests and run any combination of tests in one or more unit test sessions.

    同时专用单元测试资源窗口会让看到单元测试结构运行多少单元测试会话任意组合测试。

    youdao

  • On many Agile teams, all new code is covered by an automated unit test, and all unit tests are run every time a build is performed.

    许多敏捷团队中全部代码要经过自动化单元测试每次执行架构都会运行所有单元测试

    youdao

  • You can also arrange tests so that they are performed in sequence, group tests by categories and run them together, record the amount of time unit tests take, and much more.

    可以安排一些测试使它们执行类别组合一些测试以让它们一起运行记录单元测试花费时间以及其它许多事情。

    youdao

  • The standard battery is a 6-cell unit and an optional 8-cell battery is available providing 6:46 hours of run time with WLED display option.

    配六电池可选配8芯电池,电池续航能力为6:46小时

    youdao

  • Though you will not test your static unit tests very often, dynamic unit tests can be tested every single time you compile your code (if they all run quick enough).

    即使经常测试静态单元测试动态单元测试可以在你每一编译代码的时候进行测试如果运行得足够)。

    youdao

  • In fountain control system, the controllable silicon is used as power switch unit with the control principle of monolithic processor, which cannot run for a long time.

    喷泉控制系统中,采用单片机控制原理可控硅作为功率开关元件,由于可控硅承受过电压、过电流的能力较差,因而不能时间运行

    youdao

  • If you run database unit tests now, the data generation plan populates the database one time, at the start of your test run.

    如果现在运行数据库单元测试,则数据生成计划测试运行开始时一次性填充数据库。

    youdao

  • The problem is to determine the optimal replacement policy ( N , T )? such that the long-run expected cost per unit time is minimized.

    利用几何过程,系统大修次数N和大修时间间隔T更换策略,选择优策略( N , T)使系统经长期运行单位时间的期望费用最小。

    youdao

  • Testing the new infrastructure, both one unit at a time and all systems together. This is followed by a final "acceptance test, " run by the customer.

    验收测试(也称为功能测试客户指定来测试整个系统是否完成既定功能

    youdao

  • Testing the new infrastructure, both one unit at a time and all systems together. This is followed by a final "acceptance test, " run by the customer.

    验收测试(也称为功能测试客户指定来测试整个系统是否完成既定功能

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定