There are 15 large bulb tubular turbine-generator units with a unit capacity of 42MW in inner and outer river plants of Changzhou Hydraulic Complex.
长洲水利枢纽工程外江、内江厂房共装设15台大型灯泡贯流式水轮发电机组,单机容量42MW。
With the increasing of unit capacity, higher requirements were proposed to control the circulation boiler drum level.
随着机组容量的增大,对亚临界锅炉汽包水位控制提出了更高的要求。
After revamping, four kinds of mixed crude oil can be processed without changes in unit capacity and product specification.
结果表明,改造后装置可以加工四种混合原油,并达到原油加工量不变、生产的产品规格也不变的改造目的。
As the installed capacity and the unit capacity continuously expand, the requirements on a control system become more and more high.
随着装机容量和单机容量的不断扩大,对控制系统的要求也越来越高。
With increase of the unit capacity in the coal-fired power plants the large volume concrete foundation are more and more used in various projects.
随着燃煤电厂单机容量的增大,大体积混凝土基础在工程中的应用也越来越多。
When the unit capacity is not well cooperating with the pressure at certain process conditions, product quality decreases or catalyst loss increases.
工艺条件一定,压力决定了整个装置的处理量,处理量与压力条件不匹配,会造成产品分布不达标或者剂耗增大。
The increment of unit capacity added the complexity of turbo-generator and the force of electromagnetic load, and various physical phenomenon became more and more complex.
发电机单机容量的增加,势必增加了大型发电机结构的复杂性以及电机内电磁负荷的强度,发电机内部的各种物理现象也变得越来越复杂。
With the single unit capacity of small and medium hydropower growing increasingly and the complex of unit structure, so it put forward a higher demand about unit maintenance.
随着中小型水电机组的单机容量不断增加,机组结构日趋复杂,对机组的检修提出了更高的要求。
With the single unit capacity of small and medium hydropower growing increasingly and the complex of unit structure, so it put forward a higher demand about unit maintenance.
随着中小型水电机组的单机容量不断增加,机组结构日趋复杂,对机组的检修提出了更高的要求。
应用推荐