Combining with the undersea tunnel engineering in Jiaxing power plant, the measurement theory and method for submerged tubes to be joined together undersea are present.
结合嘉兴电厂海底隧道工程,介绍了沉管隧道对接的测量理论和实施措施。
The design technology-way of high-performance concrete mix-ratio projects used in second-level lining of Xiamen-xiang an undersea tunnel engineering is discussed.
阐述了厦门海底隧道衬砌高性能混凝土配合比方案的设计技术路线。
The design technology-way of high-performance concrete mix-ratio projects used in second-level lining of Xiamen-xiang an undersea tunnel engineering is discussed.
阐述了厦门海底隧道衬砌高性能混凝土配合比方案的设计技术路线。
应用推荐