With the design and construction conditions of Suzhoujie station, the author analyzes and studies the construction methods with PBA underground cut construction method in metro station.
结合苏州街站的设计与施工情况,对地铁车站使用PBA法暗挖施工时的施工工法进行了分析研究。
In the sixties, seventies and eighties, the fact of having to go to the underground was more clear cut, but since the advent of digital technology and the web, such a relation has become confused.
在六十,七十和八十年代不得不变成地下乐团的事实越发明确,随着数字技术和网络的到来,这种关系变得模糊不清。
Within these insulated underground passages the molten lava can continue to flow for many miles, until the source of the lava gets cut off, leaving behind a 'cave.
在这些绝缘地下通道,熔岩流能够继续对许多英里直到熔岩源,获取切断,留下了'离开洞穴。
Many mining enterprises and researchers have been interested in seeking a replacement for cement as consolidating agent for underground filling so as to cut filling cost.
寻求一种能替代水泥的胶结料用于井下充填,以降低充填成本,不少矿山企业和科研人员对此怀有兴趣。
A cut and fill approach was used and the dirt removed for underground parking was used to make the mounds in the landscape.
利用开凿和装填的手段,把建造地下停车场时挖出的泥土用来作为景观中的小丘。
During the process of exploiting the urban underground space, buildings and the space around is the first part people try to cut-in.
在对城市地下空间的开发利用中,建筑物及其周边地下空间是人们进行开发的最先切入点。
The cut to be excavated lies close to a large-scale transformer station. There are high voltage wires of more than 80 over the cut and several underground water pipes crossing with the cut.
待开挖的路堑临近大型变电站,路堑上空有80余条高压线,地下有多处输水管与路堑交叉。
How to make clear residual oil potential and distribution of all kinds of reservoir underground is an important subject of Daqing Oilfield at later stage of high water cut.
如何搞清地下各类油层中剩余油的潜力及分布,是大庆油田高含水后期的重要课题。
How to make clear residual oil potential and distribution of all kinds of reservoir underground is an important subject of Daqing Oilfield at later stage of high water cut.
如何搞清地下各类油层中剩余油的潜力及分布,是大庆油田高含水后期的重要课题。
应用推荐