• Two coefficients are made mistake in usuany designs, in this article signification of the two coefficients are introduced, then analyses the reason to control the value of coefficient.

    本文提出设计计算中有系数重视然后具体介绍了两个系数含义,着重分析控制系数大小原因

    youdao

  • Some finite iterative result of the two-point boundary value problem sequence is taken as a suboptimal control law of the system.

    从而将两点问题序列有限次迭代结果作为系统的次优控制

    youdao

  • And the study of enterprise cost control by means of value chain optimization is shown as two following parts: the first part is about basic theory research.

    本文价值链优化作为手段企业成本控制进行研究,主要结构包含部分一部分基础理论。

    youdao

  • The optimal transfer problem is converted into Two-Point Boundary Value problem based on optimal control theory.

    基于控制理论,将一个最优变轨问题转化成一个两点问题。

    youdao

  • This paper proposes two different interpolation algorithms for parametric curve. These algorithms are of great value to improve the accuracy and machining speed of numerical control system.

    本文介绍了参数曲线两种不同实时插补算法它们提高数控系统速度精度方面具有很好的效果。

    youdao

  • By introducing a sensitivity parameter, the original optimal output tracking control problem is transformed into a series of two-point boundary value problems without time-advance or time-delay terms.

    通过引入一个灵敏度参数,将最优输出跟踪控制问题转化含超前项时滞一族两点问题

    youdao

  • This paper presents PID controller using QFT and makes simulation of numerical value fabric system of two dimensional control, proves validity of controller.

    本文中介绍了利用定量反馈理论设计PID控制器自由度控制结构系统进行数值仿真验证了控制器有效性

    youdao

  • The user control displays a read-only text box with a number in it and two arrows that users can click to increment and decrement the value in the text box.

    用户控件显示只读文本,其中一个数字箭头用户可以单击这两个箭头增加减少文本框中的

    youdao

  • Objective To explore actual value on two methods between standard deviation by calculating one third of CLIA 88 permitted error and actual standard deviation in internal quality control.

    目的探讨以CL IA'88允许误差三分之一推导出标准差实际标准差生化室内质控的应用价值

    youdao

  • Finally, the average of two methods as construction project management dependability control standard value achieves the desired goal of study.

    终极两种方法均值作为施工项目治理可靠性控制标准值实现预期研究目的

    youdao

  • But the important means to achieve these two objectives at the same time is the Earned Value Method which is mean of project cost and schedule co-ordinate control.

    同时实现两个目标重要手段就是通过工程项目费用进度进行协调控制。

    youdao

  • The control right actually displays its function right in enterprise operation and its efficiency is showed on two aspects: reducing the proxy cost and enhancing the value of creation.

    控制权作为企业运作实际发挥作用权力效率体现降低代理成本提高价值创造两个方面。

    youdao

  • Instruments based on the lower limit of two switch-contact device, the pressure to set a signal or when the value of on-off control circuit for the operating system's automatic control or the use.

    仪表下限位开关型接点装置压力达到设定值发出信号控制电路,供作业系统自动控制或发讯用。

    youdao

  • Methods Patients were randomly divided into the treatment and control groups to record the index of QOL and value QOL before and after treatment between the two groups respectively.

    方法采用随机对照方法,记录治疗对照组治疗前后生存质量积分,评价治疗前后生存质量改善情况。

    youdao

  • The feed-forward block and two close-loop control methods effectively guarantee the calorific value adjusting quality of the burning gas supplying system.

    系统采用前馈闭环调整方法有效地保障池炉燃气供应系统良好的热值调节质量

    youdao

  • Firstly the optimal control problem of minimum-time strike trajectory was translated into two-point-boundary-value problem by using Pontryagin maximum principle.

    首先利用庞特里亚金极大值原理将时间最短打击轨道控制问题转化为两点边值问题。

    youdao

  • Firstly the optimal control problem of minimum-time strike trajectory was translated into two-point-boundary-value problem by using Pontryagin maximum principle.

    首先利用庞特里亚金极大值原理将时间最短打击轨道控制问题转化为两点边值问题。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定