With the wide use of Shield tunneling method in important substructure works in our country, it has become a major method applied in city subway construction.
盾构施工技术在我国重大地下工程的应用越来越广泛,已经成为了城市地下铁道建设的主要方法。
Shield tunneling method has become a primary method in underground excavation with its predominance, earth pressure balanced shield tunneling (EPBS) is the most universal type in our country.
盾构隧道法开挖凭借自身的优势成为城市地下施工的主要手段,其中土压平衡式盾构目前在国内使用较为普遍。
Research indicates that if shallow-buried tunneling can be strictly kept to the principles and technical rules of shallow-buried tunneling method, ground subsidence can be avoided effectively.
研究结果表明,严格按照浅埋暗挖法的基本原理和技术要点进行隧道施工,可以有效地避免地表塌陷事故的发生。
As the shield tunneling method is more and more widely used recent years, the study on the stress of the segments is being more important.
近年来,盾构法施工在地下工程中的应用日益广泛,因而,盾构隧道衬砌结构受力状况的研究也更显重要。
The tunneling monitoring measurment and information feedback technology is one of the major content to construct tunnels using the principle of the new Austrain tunneling method (NATM).
隧道监控量测及信息反馈技术是新奥法(NATM)原理修建隧道的主要内容之一。
However, highway tunnel engineering quality inspection and evaluation standard is being dominated by mine tunneling method that obviously exists limitation and obsolescence.
然而在公路隧道质量控制和管理方面仍沿用按矿山法制定的质量检验评定标准,显然存在局限性和陈旧性。
Also the principle of NATM (New Austrian Tunneling method) and the method of excavation and shoring in tunnel construction are being given.
文章也介绍了新奥法的原理以及隧洞的开挖和支护方法。
This paper discusses the treatment technique for highway tunnel in fault rupture zone during construction with New Austrian Tunneling Method.
结合工程实例,探讨山区公路隧道新奥法施工中地质断层破碎带的处理技术。
This paper discusses the treatment technique for highway tunnel in fault rupture zone during construction with New Austrian Tunneling Method.
结合工程实例,探讨山区公路隧道新奥法施工中地质断层破碎带的处理技术。
应用推荐