Furthermore the effects of tower top pressure, temperatures of tower top and bottom, reflux ratio on product purity were analyzed.
同时探讨了塔顶压强、塔顶和塔釜温度、回流比变化对产品纯度的影响,获得了试验条件下的最佳操作条件。
To realize high precision control of top pressure, the dynamic mathematical model of top gas pressure recovery turbine (TRT) system was researched.
为实现高炉顶压的高精度控制,提出了高炉煤气余压透平装置(TRT)系统炉顶压力的动态数学模型。
The smelting process was strengthened by using high top pressure, high pressure drop, large blowing rate, reduced tuyere section and enhanced blasting velocity.
采取高顶压、高压差、大风量、缩小风口直径、提高风速和鼓风动能等措施进一步强化冶炼;
Using the method of top pressure and out soil promoted a comprehensive rectifying deviation to the structure, and using of steel pipe pile method reinforced the base of the tower.
建于深厚软土上的某铁塔因基础周边不均匀填土后产生了严重的不均匀沉降,经采用顶压法和掏土法对构筑物进行综合促沉纠偏,同时采用钢管桩法加固处理,实践表明效果良好。
Using the method of top pressure and out soil promoted a comprehensive rectifying deviation to the structure, and using of steel pipe pile method reinforced the base of the tower.
建于深厚软土上的某铁塔因基础周边不均匀填土后产生了严重的不均匀沉降,经采用顶压法和掏土法对构筑物进行综合促沉纠偏,同时采用钢管桩法加固处理,实践表明效果良好。
应用推荐