• The singularity of hydraulic gradient, which is always found in the calculation of seepage at the toe of dam, is not accord with the reality and makes the trouble in judging the safety of the dam.

    根据现行计算方法,堤坝下游坡脚处渗流水力坡降具有奇异性,给工程设计判别渗透安全性带来困难同时实际情况符合。

    youdao

  • The results show that the failure of dam foundation is caused mainly by the extension of dam heel crack and the expansion of shear-yield zone of the foundation rock near the dam toe.

    结果表明坝基破坏主要表现裂缝延伸附近基岩剪切屈服区的扩展

    youdao

  • In this paper, the assumption of equivalent stress method only used near the dam heel and toe and the middle regions stress USES the FEM calculated stress.

    针对问题,提出局部等效应力方法,即对坝基面坝趾局部区域进行局部等效处理,坝基面中间大部分区域仍采用有限元计算

    youdao

  • Main contents and results are as follows:(1)To evaluate dam toe line is of vital importance in dam computer auxiliary design, however, its evaluation traditionally adopts graphic solution.

    求解堤坝坡 脚线堤坝计算机辅助设计一个十分重要工程问题,这一问题的求解一直采用传统的图解法

    youdao

  • Main contents and results are as follows:(1)To evaluate dam toe line is of vital importance in dam computer auxiliary design, however, its evaluation traditionally adopts graphic solution.

    求解堤坝坡 脚线堤坝计算机辅助设计一个十分重要工程问题,这一问题的求解一直采用传统的图解法

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定