-
In the course of excavation, the Contractor shall from time to time survey the position of tunnel axis and elevation.
在开挖过程中,承包人应随时测定隧道轴线位置和标高。
youdao
-
In the course of excavation, the Contractor shall from time to time survey the position of tunnel axis and elevation.
在开挖过程中,承包人应随时测定隧道轴线位置和标高。
youdao