• Drupal 7 May require the time parameter to be at least 30 seconds.

    Drupal7可能需要将时间参数设置为至少30秒。

    youdao

  • The time parameter, which filters the feed (some standard feeds only) to only contain videos published within a certain time frame

    time参数将提要(只针对一些标准提要)过滤为只包含某一时间范围内发布的视频

    youdao

  • The time parameter is also imported into the neural network to give the time-varying characteristic of the process.

    为表达过程时变的特点,引入时间参数作为神经网络的一个输入量。

    youdao

  • Sets forth all kinds of factors that affect the time parameter measuring accuracy, and proposes fairly reasonable methods.

    阐述了影响时间参数测量精度的各种因素,并提出了较合理的方法。

    youdao

  • Therefore, through the analysis of the first passage time parameter, we can conclude the general rule of the LUCC dynamic change process in the regions.

    因此通过对首达时间参数的分析,能够揭示出区域LUCC动态变化过程的一般规律。

    youdao

  • Power, test time, record period, voltage lower limit, voltage upper limit, lead internal resistance, operation model, data and time parameter can be set with keyboard.

    通过键盘可设置:功率、测试时长、记录周期、电压下限、电压上限、导线内阻、操作模式、日期、时间等参数。

    youdao

  • The reliability of moving time parameter was calculated about the launching equipment cap opening. The calculation result shows that the time parameter reliability is very high.

    并具体计算了该发射装置顶盖开启运动时间参数的可靠度。由计算结果可知,时间参数具有很高的可靠度。

    youdao

  • Owing to the difficulty of identifying dead time parameter of industrial process, a kind of new step response method is presented to identify dead time parameter of industrial process.

    针对工业过程中时滞辨识较为困难这一特点,提出一种新颖阶跃响应法来辨识工业过程的时滞参数。

    youdao

  • A method to build hierarchical network plan was presented and the compatibility between document flow and control flow was analyzed. Time parameter of hierarchical network plan was also computed.

    给出了建立分级网络计划的方法,分析了文档流与控制流的相容性,并计算了分级网络计划的时间参数。

    youdao

  • In this text, it mainly introduces the application of the fuzzy theory in network planning, and the calculation method of the fuzzy time-parameter, confirmation of the fuzzy "critical path" (CP).

    本文主要介绍网络计划中模糊理论的运用及时间参数作为模糊变量的计算方法和模糊网络关键线路的确定。

    youdao

  • At run time, parameter markers in the transactions are replaced by concrete values drawn from configurable random value distributions and input lists.

    在运行时,事务中的参数标志替换为具体的值,这些值是从可配置的随机值分布和输入列表中提取的。

    youdao

  • At run time, parameter markers in the transactions are replaced by concrete values drawn from configurable random value distributions and input lists.

    在运行时,事务中的参数标志替换为具体的值,这些值是从可配置的随机值分布和输入列表中提取的。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定