If no, whether has a bigger assurance all permits in the cost and the time in the limit develops one kind of new material.
如果没有的话,是否有较大的把握在成本和时间都允许的限度内研制出一种新材料。
The GERT network can solve not only the project time optimization problem in making bridge construction plan, but also the cost optimization in the limit of proper project time and resource.
随机网络不仅可以解决桥梁施工计划的工期优化问题,而且在合理工期和限定资源条件下,可进行施工成本优化。
And it also presents an example calculation of optimizing minimum cost time limit for fuzzy network to explain this new method.
给出了一个模糊网络最低成本日程优化的实例计算,通过实例计算说明了计算的新方法。
The cost of application tradition and the time limit management cannot mirror exactly the performance level of cost and progress, not to mention the integration control of information.
应用传统的成本和工期管理已经不能够准确反映出成本与进度的绩效水平,更不能进行信息的集成控制。
Advanced construction methods are propitious to improve quality and security of construction, shorten the time limit for a project, lower the cost of construction.
先进的施工方法有利于提高结构的施工质量和安全性,并可有效的缩短工期和降低施工成本。
Reasonable form system plays an important role in ensuring physical dimension of concrete and reducing time limit and engineering cost.
模板体系的选择合适与否,对保证混凝土的几何尺寸,保证工期,降低成本起着重要作用。
Through aimed construction management the design can meet the requirements and the limit time is shortened, which reduce the construction cost and got good economic benefit.
并通过有针对性地组织施工,使其既能满足设计要求,又能缩短工期、降低施工成本,取得良好的经济效益。
The problems of optimizing cost and project time limit occur when the curve of the project cost and project time is nonlinear.
探讨了工程成本与时间曲线为非线性时,成本与工期的优化问题。
Lending rate, the mostly ingredient in credit, has connection with time limit, fluidness, risk and manage cost.
通常,利率与贷款的期限、流动性、风险和管理成本有关系。
The construction measure can ensure construction quality, short the time limit for a project, decrease the cost of construction and insure construction safety.
这种施工方法保证了施工质量,缩短了施工工期,降低了施工成本,做到了施工安全。
A stochastic network model is built by use of the theory and method of Monte Carlo Simulation, with a view to analyzing the risk of the time limit for project and its cost.
建立一个工期和费用估计的随机网络模型,说明应用蒙特卡洛模拟进行工期和费用风险分析的原理及方法。
The paper detailed discusses the cause, meaning, controlling program, the dealing principle of time limit for a project and cost of change in the work, and discussing construction scheme optimum.
本文就工程变更的原因、意义、控制程序、变更工期和价格的处理原则、施工方案的优化进行了较为详尽的论述。
In the construction of deep foundation, the dewatering problem is often related. The choice of dewatering plan influence the quality, limit time and cost of engineering.
在深基础施工中,往往涉及到降水的问题,降水方案的选择成功与否,对工程质量、工期以及工程造价等有很大影响。
The nursing service based on whole nursing mode was discussed in respect to the extension of range, attitude, time limit, quality, cost, ethics and mistake of the service.
从服务范围的延伸、服务态度、服务时限、服务质量、服务费用及服务道德和失误方面探讨了整体护理模式下的护理服务。
This technique has such advantages as shortening time limit, enhancing production rate and decreasing cost.
采用此法,可缩短工期、提高工效、降低成本。
Accumulator is commonly used as power-supply of Portable-Type Nuclear Data Analyzer at present, which impose a limit on the Analyzer's working time and increase its volume and cost.
目前常见的便携式核数据测量分析仪电源供应为单一的蓄电池供电方式,这不仅影响测量仪器的长时间连续正常工作,而且增加了系统的成本和体积。
It has obtained the economic result of technology of economizing the cost, shortening time limit for a project.
采用该结构取得了节约成本、缩短工期的技术经济效果。
Jinan Viaduct is along a river, limited by the location circumstance, the routine construction method can't up to the investor's require on the cost and the time limit for the project.
济南顺河高架桥由于受地埋位置的局限,按常规施工方案难以满足业主在工期、成本等方面的要求。
The time limit and cost for a project are two important objectives in scheduling of projects.
工期和成本是项目计划中的两个重要目标。
'Progress' in modern project management is an integrated indicator combining systematically the engineering task, time limit, cost and resources and showing overall the construction status.
现代项目管理中的进度是一个综合的指标,它将施工项目任务、工期、成本、资源有机地结合起来,能全面反映项目的施工状况。
Forced tamping replacement, as a kind of soil foundation treatment, is widely used with the merits of good effect low cost within the shortest time limit for a project.
强夯置换法是一种处理地基的有效方法,具有适应性广、效果好、造价低、工期短的特点。
The Lasson pile supports and protections technology in the hole excavated for building foundation supports and protections, played the guarantee time limit for a project and the frugal cost role.
拉森桩支护技术在基坑支护中起到了保证工期、节约成本的作用。
In order to increase the level of project construction, this paper proposed the strategy of intensifying the time limit control and cost control.
深化项目法施工,加强工期控制和进度控制,实现企业效益的最大化。
Supply chain management and e-business are efficient ways for construction enterprises to reduce cost of, shorten time limit for and improve quality of engineering projects.
供应链管理和电子商务是建筑企业节约成本、缩短工期、提高质量的有效方法。
The results have proved that treating superficial layer soft foundation with dry vibration crushed stone piles has advantages of reliable technology, low cost and short time limit.
指出干振碎石桩处理浅层软弱地基土技术可靠,成本低,工期短的优点。
Three controls are usually stressed in the course of construction project enforcement: quality control, time limit control and cost control, among them cost control is a more important link.
工程项目实施过程中通常强调三大控制:质量控制,工期控制,成本控制。其中成本控制是项目建设过程中的一个比较重要的环节。
Making use of the relations among the direct cost, the indirect cost and the total cost, we get the best time limit for the project with results of the optimal T-C decision-making.
利用直接费用、间接费用与总费用的关系,预测出总费用最低时对应的工期,从而给出了工期一费用的最优决策。
Considering the cost control and the time limit for the emergence, the technique of compaction grouting combine with sand-gravel cushion was chosen.
结合石家庄富强电力新村工程实际,从工程设计、施工、加固效果等方面阐述了换土法—级配砂石地基加固技术的应用。
Considering the cost control and the time limit for the emergence, the technique of compaction grouting combine with sand-gravel cushion was chosen.
结合石家庄富强电力新村工程实际,从工程设计、施工、加固效果等方面阐述了换土法—级配砂石地基加固技术的应用。
应用推荐