She has to get off at another stop. Look at the schedule again, where should Sara get off the bus so that she can have a shorter walk to Flag Street?
她必须在另一站下车。再看一遍时间表,莎拉应该在哪里下车,才能可以走更短的路到旗街?
The remainder of the schedule is derived from the MPS.
进度表中的剩余材料量源于MPS。
Steven doesn't know, but I have an extra two weeks in the schedule for emergencies.
史蒂文不知道,我的日程表上留出了两周时间以防备紧急事件。
Its just the matter of the schedule, that is, if it is convenient for you right now.
如果你们感到方便的话,我想现在讨论一下日程安排的问题。
Now you are asked to specify the schedule for the new task as Figure 19 indicates.
现在,要为新任务指定调度计划,见图19。
I knew the schedule, the routine. I knew the same tasks would be waiting for me each day.
我知道时间安排,我知道例行程序,我知道每天都有一些一样的事在等着我。
I prefer the Canadian school style because it is fun and the schedule is not too long.
我很喜欢加拿大学校的风格,因为它非常的有趣,没有很长的课程表。
You can use the SchRetrieve function to retrieve the schedule of a user for a particular time.
可以使用SchRetrieve函数来检索某一用户特定时间的时间表。
Lunch went on the schedule from noon-1 p.m. but people could still run sessions if they wanted.
在日程安排中,午餐是从正午持续到下午1:00。但是如果人们愿意的话,他们可以继续开会。
The core of this is the team, which decides how to do the work, in what order, and the schedule of it.
团队是这个方法的核心,团队决定如何完成工作,以何种顺序,并制定日程。
If a task is delayed, then the schedule methods still wait the full period before running the next task.
如果任务被延迟,那么schedule方法在运行下一个任务之前仍然会等候一个完整的周期。
Here are some options that can shorten the schedule by changing the resources available to do the project.
下面是一些通过改变可用的资源来缩短开发日程的方案。
Although Patty offers to change the schedule Sherry says that she could use a few days apart from Palmer.
尽管派蒂提出为她更改日期行程,雪莉却说,她想和帕默分开几天。
Although Patty offers to change the schedule, Sherry says that she could use a few days apart from Palmer.
尽管派蒂提出为她更改日期行程,雪莉却说,她想和帕默分开几天。
When the schedule function comes to identifying the next task to schedule, it calls the pick_next_task function.
当schedule函数开始确定下一个要调度的任务时,它会调用 pick_next_task 函数。
Intelligently deciding what to put into the schedule and how to work within those boundaries is within our control.
明智地决定将什么放入时间表并如何在这些范围内工作是在我们的控制之中的。
In the Performance schedule wizard, enter the name of the schedule, and then click Finish, as shown in Figure 11.
在PerformanceSchedule向导中,输入调度的名称,然后点击Finish按钮,如图11所示。
The third is that the date the order is required can be used as the starting date from which to develop the schedule.
第三,订单日期可以作为实施进度表的开始日期。
This action launches and runs the schedule and then launches the non-editable SIP Performance Report for these tests.
该操作启动并运行计划,随后为这些测试启动不可编辑的SIPPerformanceReport 。
Set the schedule option by selecting the schedule name LargeTestData at the top of the schedule Contents section.
在ScheduleContents区域的顶部选择调度名称LargeTestData,设置这个调度选项。
Now that you have configured the schedule to save results in the intended folder, run the schedule by clicking run.
现在您已经配置了这个调度,把结果保存在预期的文件夹中,通过点击Run来运行这个调度。
By now, we were roughly one-third of the way through the budget for Phase 1, but close to halfway through the schedule.
到目前为止,我们大概使用了整个第1阶段预算的三分之一,但我们已经接近了项目时间进度的一半了。
Here are some options that can shorten the schedule by changing the characteristics of the product you're building.
下面是一些通过改变开发产品的特性来缩短开发时间的方案。
After the basics of managing the schedule, managing scope is the most important activity required to control a project.
做完计划管理的基础工作后,范围管理就成为控制项目最为重要的活动。
In the second step we sequence the schedule activities by simply placing them in the order in which they need to happen.
在第二步中,我们按照计划活动发生的顺序将它们进行排序。
The bottom line is clear: We've created a foreseeable and avoidable bottleneck on the resource and a delay in the schedule.
底线是很清晰的:我们在资源上创建了一个可以预见的、可以避免的瓶颈和一个时间计划上的延迟。
The bottom line is clear: We've created a foreseeable and avoidable bottleneck on the resource and a delay in the schedule.
底线是很清晰的:我们在资源上创建了一个可以预见的、可以避免的瓶颈和一个时间计划上的延迟。
应用推荐