The process of migration is summarized in the following five steps.
迁移过程分为以下五个步骤。
The process of migration and accumulation of ions in formation water was very complex in continental down-faulted basin.
陆相断陷盆地中,地层水中离子的运移、聚集过程比较复杂。
Finally, as JSR-109 is adopted by web server providers, the process of migration and deployment should become a routine procedure.
最后,一旦Web服务提供者采用JSR- 109,那么移植和部署就变成例行公事般简单。
We infer that UPR could win more time for the stressed cells for repairing their functions in the process of migration to their destination in organogenesis.
这提示,非折叠蛋白质应答可能通过抑制应激细胞的迁移为应激细胞的功能修复赢得了时间,在器官发生过程中发挥作用。
The process of migration centers around packaging the suspended state of the VM (represented by memory) and moving those pages to a new host, and then restoring the VM to execute.
迁移过程的中心是打包VM 的挂起状态(存储在内存中),并将这些包移动到新主机上,然后恢复 VM来执行相关操作。
The overall process also needs to address, for example, the migration of business and application logic.
全面的迁移过程还需要处理其他问题,例如,业务和应用程序逻辑的迁移。
Letting the issuer to deal with all security issues involved eases the process of integration, migration, merger, federation or building cloud applications.
取而代之的是让授权机构处理所有安全问题,包括简化集成、迁移、合并、联合或创建云应用程序的过程。
One of the factors that can influence migration process is the difference in internal implementations of optimization techniques between JVMs from different vendors.
可以对这个迁移过程产生影响的一个因素是不同供应商的优化技术的内部实现之间存在差异。
Migration is just a part of that lifecycle process, and therefore should involve rigorous testing at each stage of the project.
迁移仅仅只是生命周期过程中的一部分,因此严格的测试应该包括在项目的各个阶段当中。
Since much of the migration process is manual, hopefully these articles help you in the migration process and also in making decisions on what course to take before and during the migration.
因为迁移过程的很大一部分是手工的,希望这些文章能够帮助您进行迁移,以及在迁移之前和迁移期间做出正确的决策。
This process will be very similar to the one described in Operating system upgrade as part of a migration, beginning at Step 4.
这一过程与“作为迁移工作的一部分升级操作系统”中描述的过程(从步骤4开始)非常类似。
The migration process is divided into stages, primarily because different sets of skills are appropriate at various points in the process.
迁移过程被分成几个阶段,主要是因为不同的技能集适用于迁移过程的不同部分。
The backup or shadow server is a continuous checkpoint of the active server, which is implemented through two primary changes to the traditional process of live migration.
备用或影子服务器是活动服务器的一个连续检查点,它通过对传统动态迁移过程进行两处主要改动来实现。
This is why you must have prior knowledge of the service project's structure before you start the migration process.
这就是在开始迁移流程之前您必须了解服务项目的结构的原因。
To reiterate, the best way to mitigate the risk of unwanted packages getting to PROD is a thorough design of the migration process.
重申一下,降低不适当的包进入PROD的风险的最好方法是全面地设计迁移过程。
You can see the evolution process of the XML configuration files migration.
可以看到XML配置文件迁移的演化过程。
You still had to customize many configurations manually, which is one of the most painful tasks in the migration process.
但还需要手工定制很多配置,这是迁移过程中最痛苦的任务。
Process instance migration allows you to upgrade already running process instances to a newer version of the process definition.
流程实例迁移,让你可以升级正在运行的流程实例到新的流程定义版本。
I refer to the second process as physical-to-virtual migration, or P2V, and it's the subject of this article.
我将这第二个过程称为物理-虚拟迁移,即PV 2,并且这正是本文要论述的主题。
PROCESS_MIGRATION_TRIGGERED: This event is emitted when the migration of process instances to use a new template is started.
PROCESS_MIGRATION _ TRIGGERED:该事件在使用一个新模板的流程实例迁移开始时生成。
Backward migration is the process of downgrading the version of WebSphere MQ used by an existing queue manager, and you may need to use it if you encounter problems after a forward migration.
向后迁移是降低现有队列管理器使用的WebSphereMQ版本的过程。如果完成向前迁移后遇到问题,就有可能需要执行向后迁移。
With this approach, you use two tools, WASPreUpgrade and WASPostUpgrade, which automate much of the migration process. This approach involves the following steps.
对于这种方式,您需要使用两个工具,WASpreUpgrade和WASpostUpgrade,它们将自动完成迁移过程中的大部分任务。
In general, refactoring should be part of the normal development process (in fact, some amount of refactoring should naturally occur during the "Code Migration" stage).
通常,重组应是正常开发过程的一部分(事实上,在“代码迁移”阶段,一定数量的重组应是自然发生的)。
This was provided through the process of continuous migration to another server.
这是通过不断前移到另一台服务器的过程来实现的。
The incremental upgrade process begins with the migration of your V5 deployment manager to V6.
增量升级过程从您的版本5的部署管理器向版本6移植开始。
The incremental migration process begins with migration of your Version 5 deployment manager to Version 6.
增量移植过程从你的版本5 的部署管理器向版本 6 移植开始。
Once the overall migration process — including data, logic, and processes — is completed, the cost of maintaining multiple data sources can be reduced by eliminating the legacy system (s).
在完成了全面的迁移过程(包括数据、逻辑和流程)后,可以通过删除遗留系统来降低对多个数据源进行维护的成本。
Although the wizard does automate a significant part of the migration process, some manual intervention may be required.
虽然向导使很大一部分迁移过程自动化了,但还是需要一些人工干预。
In it, a colored cloud is used to indicate the old process model version and a pop-up message box over the cloud shows the migration history of the instance, as shown in Figure 25.
在这个小部件中,一个有颜色的云被用于指向旧的流程模型版本,在云上弹出一个消息对话框,显示实例的迁移历史,如图25所示。
If you are acquiring new hardware as part of the migration, the process may be even easier.
如果您获得了新的硬件作为移植的一部分,这个过程可能更加容易。
应用推荐