Let us assume that the normal time limit for the project is t days and the shortest time by fast working is s days.
设一项工程的正常工期为T天,通过对所有可能的工序赶工,整个工程能达到的最短工期为S天。
The programme can be used to draw up the normal time schedule and the GANTT, and to make real time scheduling in light of the actual conditions in production.
该程序能产生正常情况下的调度时间表和甘特图,并能针对生产实际情况进行实时调度。
The normal time for charging is 12 hours, in order to protect the life of batteries, the continuous time for charging is not more than 48 hours.
正常充电时间是12小时,为了保护电池的寿命,连续充电时间不超过48小时。
The normal time for charging is 12 hours, in order to protect the life of batteries, the continuous time for charging is not more than 48 hours.
正常充电时间是12小时,为了保护电池的寿命,连续充电时间不超过48小时。
应用推荐