With careful monitoring, considering the accordance of the construction schedule and the loading speed, the reclaiming process is integrated with the treatment of soft soil in this case.
该工程的特点是在严密的监测下,吹填进度和加荷速度一并考虑,围海造陆过程与软基处理过程融为一体。
The effects of different factors, such as the loading direction, the size, the loading speed, the water content and geometry shape, on the chestnut shelled force were investigated in this manuscript.
用准静态压缩试验,对影响板栗破壳力的不同因素——加载方向、板栗大小、加载速率、板栗含水率以及板栗的几何形状进行了分析。
The effects of different factors, such as the loading direction, the size, the loading speed, the water content and geometry shape, on the chestnut shelled force were investigated in this manuscript.
用准静态压缩试验,对影响板栗破壳力的不同因素——加载方向、板栗大小、加载速率、板栗含水率以及板栗的几何形状进行了分析。
应用推荐