Roof-topping works for the phase-1 main buildings, namely the central library and the central classroom building, were conducted on 8 November 2011.
而第一期的主体建筑物-图书馆及中央教学楼于11月8日已经封顶。
The CLDC was designed to be a part of the Central Library and as such has no independent exterior entrance.
儿童图书馆被设计成图书中心的一部分而没有单独的外入口。
The CLDC was designed to be a part of the Central Library and as such has no independent exterior entrance.
儿童图书馆被设计成图书中心的一部分而没有单独的外入口。
应用推荐