• Neglecting quality control - time pressure can sometimes cause programmers or project teams to be tempted to skip testing.

    忽略质量控制——时间压力有时程序员项目团队有意跳过测试过程。

    youdao

  • A mock is a "fake" object that allows you to focus on testing important features within the scope of the Rails project, rather than on interactions with external systems that you have no control over.

    mock一个对象它让我们能够集中精力测试Rails项目范围重要特性而不必关注无法控制的外部系统的交互。

    youdao

  • In the project of Air Traffic Control System Integrated Testing Tool, I have been mainly in charge of designing and developing for the multi-radar testing data simulative software by myself.

    整个“空管自动化系统综合测试平台”项目主要担负了用于多雷达数据融合测试“多雷达数据模拟软件”的设计实现工作。

    youdao

  • By creating a database project or server project, you can put your database or database server under version control and establish a testing baseline.

    通过创建数据库项目服务器项目,可以数据库或数据库服务器置于版本控制之下建立测试基线

    youdao

  • After debugging and testing, this embedded Access Control system work well and stably, and meets the project requirements. Now it has been delivered to user.

    经过调试测试产品工作正常稳定满足设计需求交付客户使用

    youdao

  • In order to appraise the quality testing of grout curtain, digital borehole camera technology is applied to three boreholes of the grouting gallery no. 3 in Xiaolangdi Water Control Project.

    为了评价帷幕灌浆效果,将数字钻孔摄像技术应用小浪底水利枢纽3灌浆3个灌浆质量检查中。

    youdao

  • "Intelligent Virtual Control" and "Control-Based Virtual Instrument" in the project are originated both inland and abroad, which is the new mode in the measuring and testing field.

    项目研究的“智能虚拟控件控件化虚拟仪器”属国内外首创仪器领域中的模式

    youdao

  • In the design of the project part, a project of computer testing and control system based on industrial computer is presented.

    方案设计部分提出一个工控机控制系统核心计算机测控系统方案

    youdao

  • In the third subsection, it is elaborated that EPC project is a comprehensive testing on the competence of contractor, success of EPC project depends on the control of risk source.

    最后阐述EPC合同承包商能力综合考验,EPC合同的执行成败取决于控制风险源头

    youdao

  • In the third subsection, it is elaborated that EPC project is a comprehensive testing on the competence of contractor, success of EPC project depends on the control of risk source.

    最后阐述EPC合同承包商能力综合考验,EPC合同的执行成败取决于控制风险源头

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定