• This further elaboration of the deliverables is captured in as-built drawings, and final operating adjustments are made during testing and turnover.

    这些特征逐步完善最终都反映竣工中。检测移交阶段,通常还以最终运行调整的形式进一步完善这些特征。

    youdao

  • This further elaboration of the deliverables is captured in as-built drawings, and final operating adjustments are made during testing and turnover.

    这些特征逐步完善最终都反映竣工中。检测移交阶段,通常还以最终运行调整的形式进一步完善这些特征。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定