The compression test diagram for these materials retains the qualitative features of the tension test diagram.
材料压缩试验图保持了拉伸试验图性能上的特征。
The loop in this sequence diagram USES a Boolean test to verify if the loop sequence should be run.
如果循环序列应该运行,这个序列图的循环使用一个布尔测试确认。
For traditional modeling techniques, such as entity relationship diagram or data flow diagram, no specific test techniques are available to date.
对于传统的建模技术,例如实体关系图或数据流程图,没有可用的特定测试技术会过时。
When you have added it to your assembly diagram, you can quickly test your new component.
将其添加到组装关系图之后,您可以快速测试这个新组件。
The diagram below shows how the roles of project manager, architect and test lead use requirements to accelerate their tasks.
下面显示的图向您展示了项目管理员,结构师和测试领导等角色是怎样使用需求来促进开发任务的。
The test suite is designed with a UML activity diagram, in which each action corresponds to a test action (test script) and each decision corresponds to a decision script, as shown in Figure 10.
测试套件使用一个UML活动图来设计,图中每一个活动都和一个测试活动(测试脚本)通信,并且每一个决策都会和一个决策脚本通信,如图10所示。
The Activity diagram (described in Part 2 of the article) uses the functions of the test context for its execution.
活动图(如文中第 2 所描述的)执行时使用测试环境的功能。
The test paths are then designed based on the use case diagram, through which all relevant relationships and possible choices are passed at least once.
然后基于用例图来设计测试路径,通过这些,所有相关关系和可能的选择至少要一次通过。
Sequence diagram test cases visualize how the system under test should be interacting with other instances over time.
序列图测试用例显示了,测试之下的系统可以与其他的实例相交流。
The use case model allows testers to visually identify their test cases, especially when the process includes a use case diagram.
用例模式允许测试人员从视觉上识别他们地测试用例,尤其是当这个过程包括一个用例图时。
In order to be able to test by means of use cases, besides the use case description and a use case diagram, additional information regarding specific aspects is required.
为了能够依靠用例来测试,除了用例描述和用例图之外,还需要有关特定方面的额外信息。
Right click the canvas in the assembly diagram and select Test Module.
在组装关系图中,右键单击画布并选择Test Module。
Right-click the canvas in the assembly diagram and select Test Module.
在组装关系图中右键单击画布并选择Test Module。
Wire the test module to the mock service module by expanding the MT_TestArchiveRetrievalApp module, and open its assembly diagram.
通过展开MT _ TestArchiveRetrievalApp模块并打开其组装图,将测试模块连接到模拟服务模块。
Enhanced sequence diagram test cases.
改进的序列图测试用例。
New test actions, which are not specified in the activity diagram, can be added in the decision table before importation in the Functional Tester test project.
新的测试活动没有被列在活动图表中,但是可以在导入到FunctionalTester测试项目之前添加到决策表中。
Open the publisher assembly diagram, right-click in the diagram and click Test Module.
打开发布者组装关系图,右键单击该关系图并单击TestModule。
X (3) : The SIP Modeling Toolkit can be used to automatically generate automated SIP test scripts from a UML Callflow diagram.
X(3):这个SIPModelingToolkit可以用来从一个UMLcallflow图表中自动生成自动的测试脚本。
Typically, you would test a module by right-clicking the module in the Business Integration view, or by right-clicking the module assembly diagram and selecting test module.
通常,通过在BusinessIntegration视图中右键单击模块,或右键单击模块组装关系图并选择TestModule来测试模块。
You can run the component test feature by right-clicking the appropriate SCA component in the Assembly Diagram and choosing test component as shown in Figure 9.
可以通过在装配关系图中右键单击相应的SCA组件并选择TestComponent类运行组件测试功能,如图9中所示。
Now set up the assembly diagram to test the relationship via the interface map component.
现在,对装配图进行设置以通过接口映射组件测试这个关系。
The diagram in Figure 2 shows one possible workflow for a test team that consists of a test manager, test lead, tester, and lab manager.
图2中的图显示了一个测试团队的可能工作流程,该测试团队由测试管理员、测试负责人、测试员以及实验管理员组成。
To begin creating test cases, User Acceptance test resources will need to look at the flow diagram for the use case.
要开始创建测试用例,用户验收测试资源将需要查看这个用例的流程图。
Now, set up the assembly diagram to test the relationship via the interface map component.
现在,设置装配图,以便通过接口映射组件测试关系。
Right-click on the export on the Assembly Diagram and select Test Component (see Figure 16)
在组装关系图上右键单击导出,并选择TestComponent(参见图 16)
Experienced at control panel building and testing, can build and test the panel according to Electrical Diagram.
有控制面板的经验和测试,可以建造建筑物和测试小组根据电图。
Based on UML activity diagram, the system test method was described.
基于UML活动图对系统测试的方法进行研究。
A method is proposed for automated unit test of object-oriented program, which USES the specification of extended state diagram as the input.
提出了一种使用经过扩充的状态图规格描述作为输入的自动化单元测试方法。
At last, how to get test case from test scenario was discussed. Thereby automatic generating test case from UML activity diagram became systemic, feasible and effective.
最后,讨论了从测试场景到测试用例的方法,从而为uml活动图的自动化测试提供了系统的、有效的、可行的方法。
The time-delay parameter test of time relay, SCM test block diagram and software flow chart are introduced.
介绍时间继电器延时参数的测试,单片机测试框图以及软件流程。
应用推荐