The resource file is compiled into the test assembly.
该资源文件将编译为测试程序集。
When you have added it to your assembly diagram, you can quickly test your new component.
将其添加到组装关系图之后,您可以快速测试这个新组件。
Now, set up the assembly diagram to test the relationship via the interface map component.
现在,设置装配图,以便通过接口映射组件测试关系。
You can use a small sample of test data to check to see if the logic of the assembly is correct.
您可以使用一小部分测试数据以便查看集合的逻辑是否正确。
Right-click the canvas in the assembly diagram and select Test Module.
在组装关系图中右键单击画布并选择Test Module。
Open the publisher assembly diagram, right-click in the diagram and click Test Module.
打开发布者组装关系图,右键单击该关系图并单击TestModule。
Wire the test module to the mock service module by expanding the MT_TestArchiveRetrievalApp module, and open its assembly diagram.
通过展开MT _ TestArchiveRetrievalApp模块并打开其组装图,将测试模块连接到模拟服务模块。
If you want to test all of the components of your module, then you can right-click the assembly editor canvas and select test module.
如果您需要测试模块的所有组件,则可以右键单击组装编辑器画布,并选择Test Module。
Typically, you would test a module by right-clicking the module in the Business Integration view, or by right-clicking the module assembly diagram and selecting test module.
通常,通过在BusinessIntegration视图中右键单击模块,或右键单击模块组装关系图并选择TestModule来测试模块。
Right click the canvas in the assembly diagram and select Test Module.
在组装关系图中,右键单击画布并选择Test Module。
You can run the component test feature by right-clicking the appropriate SCA component in the Assembly Diagram and choosing test component as shown in Figure 9.
可以通过在装配关系图中右键单击相应的SCA组件并选择TestComponent类运行组件测试功能,如图9中所示。
Once the Assembly has been run with the test data, you will see the message test completed.
一旦Assembly已经与测试数据一起运行,您将看到Test completed的消息。
Now set up the assembly diagram to test the relationship via the interface map component.
现在,对装配图进行设置以通过接口映射组件测试这个关系。
The company is now prepared to complete the design, assembly and integration of the beam control system, leading up to a test in 2010.
目前,该公司正在准备完成设计、对光束控制系统进行集成,并最终于2010年进行测试。
After the first assembly of your parachute you must perform an opening test and, before every take off, you must control the proper position of the handle.
在您第一次装配好滑翔伞之后,您必须进行一个检测,在每次离开地面之前,您必须控制手柄的适当的位置。
Company Sets machining and assembly in one, with a comprehensive means test and improve the quality of management.
公司集机加工和装配于一体,拥有完备的检测手段和完善的质量管理。
The manufacturer of all PVC or CPVC bleach ball valves must complete all components prior to the factory assembly, test, and packaging of those valves.
所有PVC或CPVC漂白剂球阀的制造商必须在进行工厂组装、测试和阀门包装之前全部完成所有的部件的生产。
Design output should provide necessary data for purchase, fabrication, test, assembly, use, maintenance and service. Documents should be established for design output, including.
设计输出应为采购、制造、检验、试验、装配、使用、维护和服务,提供必要的依据。设计输出应形成文件,文件包括。
To run this test, I'll need to build the project, open the generated assembly in the NUnit application, and then click the run button.
要运行该测试,我需要生成项目,在NUnit应用程序中打开生成的程序集,然后单击Run按钮。
Design concept and concrete scheme of a test bench for hydro-mechanical transmission assembly on loaders are depicted in the article.
介绍了一种装载机液力机械传动变速器总成检测试验台的设计思路与具体方案。
For simple assemblies, the number of boards with these problems is small, so many companies pass the boards on to final assembly without a functional test.
对于简单的装配而言,电路板虽然存在这样的问题,但是数量少,所以很多公司在最后的装配过程中没有对电路板进行功能测试。
For complex boards or boards that aren't tested with an in-circuit tester, most companies perform a functional test before final assembly.
对于复杂的电路板或者没有经过在线测试的电路板而言,很多公司在最后装配之前进行功能测试。
Retest the EJB via the import: right-click on the TemperatureEJB import on the Assembly Editor canvas and select test Component.
通过导入重新测试e JB:在组装编辑器画布上右键单击TemperatureEJB导入,并选择Test Component。
Define and design tooling, fixtures andprograms used in assembly and test process, lead regular tooling/fixture/program verificationor calibration activities.
定义和设计装配和测试过程中使用的工装,夹具及程序,领导定期的工具/夹具/程序确认或校验活动。
Right-click on the export on the Assembly Diagram and select Test Component (see Figure 16)
在组装关系图上右键单击导出,并选择TestComponent(参见图 16)
The first two lines of assembly code at B0 and B5 load the instance reference from memory location 049388C8 into eax and test for null.
B0和B5 处的前两行汇编代码将 instance引用从内存位置 049388C8 加载至eax 中,并进行 null 检查。
Results for HTTP put and delete actions now appear in the Test tab of the Package Assembly Tool.
HTTPput和delete行为的结果现在可以显示在PackageAssemblyTool的Test标签上了
Note: For both of the following tests the test kit must be held at the same level as the assembly being tested.
注意:对于下列两个检测程序,当总成在检测时,检测组件都必须保持在相同的水平上。
However, before you ship an assembly or binary file, you can test it to determine whether it has been instrumented.
然而,在您发布程序集或二进制文件之前,您可以对它进行测试,以确定它是否被检测过。
After performing the shorts and opens test the in-circuit tester tests each component on a PCB assembly one at a time.
短路、开路测试完成以后,在线测试仪需要在同一时间对印刷电路板上的每一个器件进行测试。
应用推荐