• DSPC requires the Long Term Contractor provide DSPC required PPE by themselves, as written in their contract.

    根据合同规定苏州杜邦要求此类承包商自行解决个人防护用品

    youdao

  • Short term Contractor - Contractor who has signed the short term contract with DSPC, and will be outside DSPC after fulfilling the job.

    短期承包商- - -承包商苏州杜邦短期工作合同,当合同所规定的工作结束后承包商离开公司。

    youdao

  • Long term ContractorContractor who has signed the Long term contract with DSPC, and will continue to do the job on a regular basis until the termination of contract.

    长期承包商- - -承包商苏州杜邦长期合同,此类承包商长年累月在公司工作直至合同取消。

    youdao

  • DSPC responsible areas will handle the required PPE for the short term contractor and assist to smooth other required safety materials 'process such as purchase, borrow and compensation.

    苏州杜邦相关区域负责短期承包商个人防护用品其他安全用品购买借领赔偿

    youdao

  • In case a contractor deceases during the term of a contract, the successor of the deceased contractor may continue the contract.

    承包人承包期内死亡承包人的继承人可以继续承包。

    youdao

  • Long term requirement for a full time mud engineer will be mutually agreed between CONTRACTOR and COMPANY after sufficient experience is gained.

    全职泥浆工程师长期要求,在取得充分的经验,由承包商公司一致同意。

    youdao

  • Long term requirement for a full time mud engineer will be mutually agreed between CONTRACTOR and COMPANY after sufficient experience is gained.

    全职泥浆工程师长期要求,在取得充分的经验,由承包商公司一致同意。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定