The second temporary pier was such that its legs straddled the width of the pier.
第二临时墩的立柱间距超过桥墩的宽度。
The 200,000 tons berth in Fangchenggang port mainly adopts gravity pier structure. Its substructure is a large temporary cyl inder with bottom plate.
广西防城港20万吨级码头为重力墩式结构,其下构为临时有底大圆筒。
The 200,000 tons berth in Fangchenggang port mainly adopts gravity pier structure. Its substructure is a large temporary cyl inder with bottom plate.
广西防城港20万吨级码头为重力墩式结构,其下构为临时有底大圆筒。
应用推荐