• Here's another Grumman aircraft, the TBM Avenger.

    这里另一个格鲁曼飞机隧道掘进机复仇者。

    youdao

  • During the construction, the imported TBM was first used.

    施工首次引进敞开式全断面挖掘机(TBM)。

    youdao

  • Results The total leucocytes increased in CSF of TBM patients.

    结果结核脑膜脑炎患者脑脊液白细胞总数升高

    youdao

  • This article thus provides new research results for the TBM tunneling field.

    因此本文领域研究成果是新颖的。

    youdao

  • The methods of the forced ventilation and mixed ventilation in TBM construction are compared.

    对比分析TBM施工一般采用压入式通风混合式通风的优缺点和适用条件。

    youdao

  • The cause of deviation of driving with TBM in Qinling Tunnel is the difficult geological condition.

    由于秦岭隧道部分地段地质方面原因,使TBM掘进发生了偏离现象

    youdao

  • Using this method the problem of measuring target directional angle in anti-TBM aimed warhead was solved.

    方法应用反导定向战斗部,解决了反导定向战斗部确定目标方向信息技术难题

    youdao

  • In this paper, the state of rock debris cutted off by TBM in different geological conditions is presented.

    文章介绍了围岩TBM刀具作用下,不同地质条件下形成的岩碴的状态

    youdao

  • A suggestion was given that we should enforce CBM on the basis of TBM, to realize maintenance on forecast finally.

    提出在定期检修基础上加大状态检修力度,最终实现预知检修

    youdao

  • TBM-6 type blade shape measure Instrument for hydraulic turbine runner and its application were introduced in this paper.

    本文介绍了TBM - 6水轮机转轮测绘及其应用情况。

    youdao

  • TB880E hard rock TBM was imported from WIRTH Company of Germany according to the construction condition of Qinling tunnel.

    TB 880e掘进机是根据秦岭隧道修建条件德国WIRTH公司订购的全断面掘进机

    youdao

  • On the whole, this is a good experience for the construction of the tunnel with large cross-section and super length by TBM.

    实践证明,断面超长隧洞TBM施工段设置中间施工支洞,一个成功经验

    youdao

  • The research and application of the TBM-6 type blade shape measure Instrument for hydroturbine runner were introduced in this paper.

    全面介绍了TBM - 6大型水轮发电机组水轮机转轮测绘开发、研制应用情况

    youdao

  • Research purpose: as a main tool to cut rock, disc cutter was mainly assembled on cutting wheel of TBM, mixed shield and rock shield.

    研究目的盘形滚刀一种重要刀具,主要掘进机(TBM)、复合式岩石盾构刀盘上。

    youdao

  • Abstract: : TBM(Tunnel Boring Machine) Cutting Tools Configuration is one of the most important factor during TBM cutting tool design.

    罗要:构机刀具配置盾构机刀具设计非常重要内容。

    youdao

  • The helium cooling system is an important ancillary system of the dual-functional lithium lead test blanket module(DFLL-TBM) for ITER.

    氦气冷却系统ITER中国液态实验包层模块DFLL-TBMITER装置内进行实验重要辅助系统。

    youdao

  • Objective to assess the clinical, laboratory, radiological features of TBM in the aged TBM patients and probe the strategy of treatment.

    目的评估老年人结核性脑膜炎临床实验室影像学特点探讨治疗对策

    youdao

  • Combining the soil pressure balance TBM selected in certain tunnel construction, the paper makes check calculation to the key parameters.

    并结合隧道施工选用平衡盾构机关键参数进行了校核计算

    youdao

  • Correctly determining quality parameters of rock is the theoretical basis of use of TBM (full face rock tunnel boring machine) and its design.

    正确确定岩石性能参数断面岩石掘进机使用高性能全断面岩石掘进机研制的理论基础

    youdao

  • The shield TBM is regarded as an effective tool during construction under soft geological condition, which has a history of 30 years in China.

    掘进机软弱地质条件下安全施工有效机具,在我国已有30多年历史

    youdao

  • By experts'measures, the TBM will pass through 13 buildings underground. Precise measures have been taken to ensure the safty of the buildings.

    经过测量,构机需要下穿13建筑物,事先采取周密的监测措施保障建筑物安全

    youdao

  • The relationship between the operation system of TBM and the guarantee system as well as their composition are described in a micro-cosmic view.

    并从一定微观角度阐述了TBM施工作业系统保障系统的关系构成

    youdao

  • With TBM is applied in the tunnel construction comprehensively, study of advance geological prediction on the basis of TBM construction overhangs.

    随着TBM广泛应用于隧洞施工,致使基于TBM施工隧洞超前地质预报研究日显突出。

    youdao

  • Objective To study the characteristics of T-lymphocyte subpopulations in the patients with tuberculosis meningitis (TBM) and pulmonary tuberculosis (PTB).

    目的探讨结核性脑膜炎(TBM)活动性肺结核(ptb)病人T淋巴细胞亚群特点

    youdao

  • Being a crucial factor in influencing the performance of Full Face Rock Tunnel Boring Machine (TBM), the cutterhead design is one of the key issues of TBM.

    刀盘设计断面岩石隧道掘进机(TBM)设计关键影响其掘进性能决定性因素

    youdao

  • The paper has brought out functions of the reentry trajectory of TBM in case of the predigest model of atmosphere and solved them by the Runge-Kutta method.

    文中简化大气模型下建立TBM的再段方程,采用龙格-库塔来求解通过仿真,可以看出模型符合仿真需要。

    youdao

  • A simulation of dynamic forces acting on invert prefabricates in TBM construction tunnel is made with surrounding rock-structure model by using ANSYS software.

    运用计算软件ANSYS,采用围岩—结构模式TBM施工隧道仰拱预制进行模拟动态施工的受力计算研究。

    youdao

  • This paper introduces the used safety measures and the matters needing attention in construction of tunnel cut by TBM method in Tashan coal mine of Datong City.

    文中介绍隧洞掘进机(TBM大同塔山矿主平峒掘进施工中采取安全措施应该注意事项

    youdao

  • Situation monitoring and trouble diagnosis expert system for TBM is developed. The structure principle, inference rule and goal attaining process are described.

    基于专家系统工具,开发了TBM状态监测故障诊断专家系统,阐述了系统的结构原理推理规则目标实现过程

    youdao

  • Situation monitoring and trouble diagnosis expert system for TBM is developed. The structure principle, inference rule and goal attaining process are described.

    基于专家系统工具,开发了TBM状态监测故障诊断专家系统,阐述了系统的结构原理推理规则目标实现过程

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定