A collaborative design process is often a long and complex one using approaches based on task decomposition.
协同设计活动一般是采取任务分解及合成方式进行工作的复杂、长期过程。
Ordered task decomposition (OTD) algorithm is an efficient algorithm for hierarchical task network (HTN) planning.
顺序任务分解算法(otd)是层次任务网规划(HTN)中的一种高效求解算法。
Technology selection, integration scheme design, resource allocation, task decomposition, and technology roadmap are made based on our system design.
基于系统设计方案,我们将进行技术选择、集成方案设计、资源调配、任务分解和技术路线时间节点的制订。
In the initial phase of the collaborative design, reasonable task decomposition ensure that the design is going well on, to enhance the design efficiency and quality.
在产品协同设计的初始阶段,合理的任务分解有利于协同设计的顺利进行,从而提高设计效率与质量。
A kind of time optimal formation strategy is proposed, which is based on path planning and task decomposition as well as an effective algorithm for assignment problem.
针对移动机器人的最速编队问题,结合路径规划和任务分解,提出一种分派问题的新解法和时间最优的编队策略。
From organizational mission to task decomposition, the whole process includes domain decomposition, goal decomposition, process decomposition and action decomposition.
组织使命到任务分解,包括域分解、目标分解、过程分解和行为分解等。
Due to the randomness and blindness in the task decomposition and task allocation of the cooperative design, a dialogue-based multi-agent interaction framework was proposed.
针对传统协作设计过程中任务分解、任务分配的随意性和盲目性,提出了一种基于对话的多智能体协作交互模型。
The task of creating internal decomposition falls to extensions to the main transform.
创建内部分解的任务落到了主体转换的扩展肩上。
Refer to Rational SOMA for details regarding finer-grained workflow decomposition and step descriptions for each task.
请参考RationalSOMA,以了解关于细粒度工作流分解的详细介绍,以及每一个任务的步骤说明。
This kind of parallel decomposition is often called fork-join because executing a task forks (starts) multiple subtasks and then joins (waits for completion) with them.
这种并行分解方法常常称作fork-join,因为执行一个任务将首先分解(fork)为多个子任务,然后再合并(join)(完成后)。
Based on this point, this paper proposes a new task partition scheme for matrix QR decomposition, and a new coarse granularity parallel algorithm is given.
基于这一点,本文对矩阵的QR分解提出了一种新的任务划分策略,并由此得到了它的一种粗粒度并行算法。
Then, based on the decomposition of task section plane of general missile control software, the procedures for the operational reliability .
对综合控制软件的任务剖面进行了分解,并给出了软件在系统测试与飞行试验阶段运行可靠度的计算方法。
The algorithm based on model decomposition was proposed for the problem of multi-machine task scheduling with time Windows.
针对多机带时间窗口任务规划问题,提出了基于模型分解的规划求解算法。
The algorithm based on model decomposition was proposed for the problem of multi-machine task scheduling with time Windows.
针对多机带时间窗口任务规划问题,提出了基于模型分解的规划求解算法。
应用推荐