Task 2: Optimizing your keywords.
任务2:对关键词进行优化。
Task 2: Generate a skeleton J2C bean capable of accessing IMS
任务2:生成能够访问 IMS的 J2Cbean 的代码框架
Implementation of Task 2 depends on your application requirements.
任务2的实现取决于您的应用程序需求。
Task 2 is in two parts: For Task 2A, the pitches are pre-composed;
作业2分做两部份:在作业2A,音高是事先作好的;
You are ready to perform this step after completing Task 1 and Task 2 from Table 2.
完成了表2的任务1和任务2后,就准备好进行此步骤了。
Task 2: Create a PHP code module to do the necessary business logic and the DB calls.
任务2:创建一个PHP代码模块来执行必需的业务逻辑和数据库调用。
Task 2: Investigate the transplantation policies used in a country other than the US.
任务2 :调研不同于美国的另一个国家的移植政策。
The upper branch leads to a fork that causes Task 1 and Task 2 to execute in parallel.
上面的分支通向一个fork,后者可以使Task1和Task 2并列执行。
For a single parallel execution of Task 2 and Task 3, we obtain two executions of Task 4.
对于Task 2和Task3的单次并行执行,我们将执行Task4两次。
In the Writing paper what happens if I write the answer for Task 1 on the page for Task 2?
在写作的作文纸上,如果我把第一题错写在第二题的位置怎么办?
Task 2. Provide an example of how the table could be used for a specific time trial course.
任务2。提供一个例证,说明这个表格怎样用于一条时间试验路线。
Task 2 has a single input criterion, in which two connections end, acting as an implicit join.
Task 2具有一个输入条件,其中接入了两个连接,可充当隐式的join。
See your new priority-based order? You do Task 3 first, Task 2 second, and Task 1 last–if at all.
看出你新的优先度排名了吗?你要先做任务三,其次是任务二,最后做任务一。
As we already know from our discussion in Section 2, Task 2 will wait for all inputs in this single input criterion.
我们在第2部分的讨论中已经知道,Task 2将等待此单个输入条件的所有输入。
The second and third branches both lead to Task 2 and do not involve any activity between the decision and the first merge.
第二个和第三个分支都引向Task 2,它们在 decision 和第一个merge之间不执行任何活动。
Task 2 asked subjects to judge if a given Pin Yin was the correct Pin Yin form for a following bracketed Chinese character.
任务2要求受试判断拼音是否是所给汉字的正确拼音。
This is where we will use the XML schemas that were generated by the generate XML converter wizard when you performed Task 2.
此时我们需要使用XMLschemas, XML schemas是在您执行任务2时由生成XML转换器向导生成。
However, these two inputs cannot possibly both arrive at the same time, because one of them is produced as an output of Task 2.
但是,这两个输入无法同时到达,因为其中一个输入是作为Task 2的输出产生的。
If both branches are triggered, the inclusive decision leads to a parallel execution of Task 2 and Task 3 in the same way as a fork.
如果全部触发这两个分支,则包含性决策将导致Task 2和Task3并行执行,其效果与fork类似。
If you write less than 150 words in Task 1 or less than 250 in Task 2 you will lose marks, but there is no maximum number of words for either.
雅思写作中,如果第一部分不够150字或者第二部分不够250字,你会被扣分,但是两个部分都没有最多字数的限制。
However, the process will not release its data in the simulation because the parallel branches involving Task 2 and Task 3 do not end with a stop node.
不过,在进行模拟时,该流程将不会释放它的数据,因为涉及Task 2和Task3的分支不是以停止节点结束的。
Task 3: Prepare a three page position paper to the university President that describes the strengths, weakness, and flexibility of your model in Task 2.
任务3:为大学校长准备一个3页左右的描述你在任务2中所建模型的优点、弱点和灵活性的立场声明。
By defining different output criteria, we model that Task 1 provides alternative outputs, namely either item a or items B and C. Based on the output, either Task 2 or Task 3 executes.
通过定义不同的输出条件,我们规定,在模型中,由Task1提供可选输出,即项目a或项目b和c。并根据输入,执行Task 2或Task3。
If not, this distinction appears to be redundant, because exactly the same behavior is modeled twice, i.e., the single Task 2 is executed as a result of taking any of these two decision branches.
否则,此差别将显示为冗余,因为同一行为被建模两次,即对于这两个decision分支中的任何一个,都将执行单个Task 2。
Please bear in mind that the price includes moving all the furniture, and the whole task would take 2 days.
请记住,这个价格包括搬运所有的家具,而且完成整个工作需要2天的时间。
But recall that the scheduling classes are part of the task structure itself (see Figure 2).
但是不要忘了调度类是任务结构本身的一部分(参见图2)。
Figure 2 shows the archive task profile Settings.
图2显示存档任务配置文件设置。
The Risk List is produced by the Identify and Assess Risks task of the Project Management discipline (Figure 2).
风险列表由项目管理规程的鉴别并估计风险任务生成的(图2)。
The Risk List is produced by the Identify and Assess Risks task of the Project Management discipline (Figure 2).
风险列表由项目管理规程的鉴别并估计风险任务生成的(图2)。
应用推荐