• Task 1: Import schema script for source database.

    任务1:导入用于源数据库的模式脚本。

    youdao

  • The process receives item A as input, which it passes on to Task 1.

    该流程把接收到的项目A作为输入,并将其传递给Task 1。

    youdao

  • Task 1 is followed by a decision leading to two subsequent branches.

    Task 1后面跟的是引向两个后续分支的decision。

    youdao

  • These types are the Data Binding types that you created in the Task 1.

    这些类型是您在任务1中创建的Databinding类型。

    youdao

  • Task 1, 2 & 3 are compulsory tasks and must be completed before any other tasks.

    作业1、2、3是必须做的作业,在其他作业之前必须全部完成。

    youdao

  • It is rather unlikely that Task 1 produces several copies of the item a as output.

    Task 1不大可能将生成的项目a的几个副本作为输出。

    youdao

  • You are ready to perform this step after completing Task 1 and Task 2 from Table 2.

    完成了表2的任务1和任务2后,就准备好进行此步骤了。

    youdao

  • Be sure to reference how you used your models from Task 1 to help address the issues.

    务必说明怎样参考任务1中你们的模型来帮助回答这些问题。

    youdao

  • The upper branch leads to a fork that causes Task 1 and Task 2 to execute in parallel.

    上面的分支通向一个fork,后者可以使Task 1和Task2并列执行。

    youdao

  • This node is connected to Task 1, symbolized by a yellow rectangle with rounded corners.

    此节点连接到Task 1,后者用黄色的圆角矩形表示。

    youdao

  • In the Writing paper what happens if I write the answer for Task 1 on the page for Task 2?

    在写作的作文纸上,如果我把第一题错写在第二题的位置怎么办?

    youdao

  • Task 1: Generate data Binding classes corresponding to COBOL input and output data structures.

    任务1:产生与COBOL输入和输出数据构成相对应的Databinding类。

    youdao

  • Notice also that business item A leaves Task 1 four times, while item B leaves this task two times.

    您还会注意到,业务项A四次离开Task 1 ,而业务项B 则有两次离开这个任务。

    youdao

  • See your new priority-based order? You do Task 3 first, Task 2 second, and Task 1 last–if at all.

    看出你新的优先度排名了吗?你要先做任务三,其次是任务二,最后做任务一。

    youdao

  • Since this service meets your task 1 requirement, you decide to reuse this EJB service in your BPEL process.

    由于此服务满足任务1 的需求,所以您决定在BPEL流程中重新使用此EJB 服务。

    youdao

  • No, you shouldn't try to explain reasons for the data in writing task 1. Just describe what you can see.

    不可以。在短作文中,你不应该试图解释数据背后的原因。只要描述你看到的即可。

    youdao

  • Using the parameters that you created in task 1, define the key elements of a successful society for the next 10 years.

    使用您在任务1中创建的参数,定义未来10年成功社会的关键要素。

    youdao

  • This client JAR file was generated by default by the tooling when the EJB proxy application was created (see Task 1 in Table 2).

    此客户机JAR文件是在创建EJB代理应用程序时由工具创建的(请参见表2中的任务1)。

    youdao

  • To route the items in parallel to two process fragments (visualized by the blue boxed areas), the modeler duplicated the outputs of Task 1.

    为了将项目并行路由到两个流程片段(即用蓝色框住的区域),modeler复制了Task 1的输出。

    youdao

  • If you write less than 150 words in Task 1 or less than 250 in Task 2 you will lose marks, but there is no maximum number of words for either.

    雅思写作中,如果第一部分不够150字或者第二部分不够250字,你会被扣分,但是两个部分都没有最多字数的限制。

    youdao

  • Implementation of Task 1 involves using the appropriate wizards in Rational Application Developer to create a session bean and a Web service client proxy.

    任务1的实现涉及到使用RationalApplication Developer中恰当的向导来开发会话Bean和Web服务客户机代理。

    youdao

  • Figure 5 shows Task 1 with three different inputs of type a, B, and c, and three different outputs: one control-flow output and two outputs of type B and c.

    图5显示的Task 1具有三种不同的输入(类型分别为a、b和c)和三种不同的输出(一个控制流输出,另外两个的类型分别为b和c)。

    youdao

  • Create a model for the problem in Task 1 that is flexible enough to adapt to changing technological capabilities and can be applied to different organizations.

    请针对任务1中的问题建立一个模型,并使得这个模型有足够的灵活性,既可以适应技术能力的迅速变化,又可以移植应用于不同的机构。

    youdao

  • This mistake can lead to an explosion of uncontrolled iterations of the process-in the example for Task 1-which can sometimes be detected by using Business Modeler simulation.

    此错误可导致流程中的无控制迭代激增(本示例中为Task 1的迭代),此情况有时可使用Business Modeler模拟检测出来。

    youdao

  • The process model fragment in this figure shows an example where Task 1 can execute if it either receives a business item A with some event 3, or if events 1 and events 2 occur.

    在本图的流程模型片断中显示了一个示例,在该示例中,如果Task 1接收到一个业务项A和事件 event3,或发生了events 1和 events 2 ,那么 Task 1 将会执行。

    youdao

  • By defining different output criteria, we model that Task 1 provides alternative outputs, namely either item a or items B and C. Based on the output, either Task 2 or Task 3 executes.

    通过定义不同的输出条件,我们规定,在模型中,由Task 1提供可选输出,即项目a或项目b和c。并根据输入,执行Task2或Task3。

    youdao

  • In this task, you are to read aloud a short passage. You will have 45 seconds to go over the passage and 1 minute to read it aloud.

    在本任务中,你需要大声朗读一篇短文。你将有45秒的时间浏览全文,答题时间为1分钟。

    youdao

  • So, for example, if semaphores were numbered 1 to 10, each task would start by locking the lowest number first, working its way up to the highest numbered.

    例如,如果信号量编号为1到10,那么每个任务先锁住编号最低的信号量,然后依次锁住信号量,直到编号最高的信号量。

    youdao

  • So, for example, if semaphores were numbered 1 to 10, each task would start by locking the lowest number first, working its way up to the highest numbered.

    例如,如果信号量编号为1到10,那么每个任务先锁住编号最低的信号量,然后依次锁住信号量,直到编号最高的信号量。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定