It also allowed us time to test the 595 before we unleashed any workload onto the system.
这还让我们在把工作负载转移到新系统之前有时间测试595。
Response time breakdown shows you how much time was spent in each part of the system under test as the system was exercised.
响应时间分解为您显示了系统的每一个部分在测试期间的时间所占用系统运行总时间的比重。
From a skills transfer standpoint, the system test core team, at the appropriate time, can introduce the new technology and release content to the broader system test team.
出于技能转移的立场,系统测试核心团队在适当的时候可以向较广大的系统测试团队介绍新的技术和版本内容。
Finally, and in the most extreme case, the development integration run time and system test environments can be combined.
最后,在最极端的情况下,开发集成运行时环境和系统测试环境可以组合在一起。
Even if your team does reserve a long or late period for system test, it is important in a Value Stream Map to distinguish between the time spent doing actual testing and the time fixing code.
就算团队为系统测试保留了很长或者晚期的时间,那么在价值流图中区分花在实际测试与花在代码修复上的时间就非常的重要了。
If this is a live system, plan time to repair any damage a test may cause, such as a failed router or hard disk.
如果测试是在活动的系统上进行的,应该计划相应的时间以修复测试可能导致的任何破坏,例如路由器或硬盘故障。
This may be possible for development test and system test environments, but other run time environments have restrictions that make such practices impractical, if not impossible.
对于开发测试和系统测试环境有可能是这样,但是由于其他运行时环境的限制,使得这些操作即使不是不可能的,就是不切实际的。
In these cases, the developers and test team can lose precious time waiting for a fully integrated and functional system.
这种情况下,开发和测试团队需要付出更多宝贵的时间才能实现一个完整的、有效的系统。
For example, you might want a system clock to always return the same time so that your test has repeatable results that you can verify.
例如,您可能希望系统时钟总是返回相同的时间以便测试能够有可验证的重复结果。
Most organizations have more than one run time environment, including development test, system test, performance, and pre-production.
大多数组织拥有一套以上的运行时环境,包括开发测试、系统测试、性能和预生产。
Response time breakdown shows you how much time was spent in each part of the system under test code as the system was exercised.
当这个系统运行时,响应时间细分数据为您显示了被测试系统的每一部分所花费的时间。
This may be possible for development test and system test environments, but other run time environments have restrictions that make such practices impossible.
对于开发测试和系统测试环境来说这是可能的,但是其它的运行时环境存在约束,所以这种方式是不可能的。
System test more easily verified fixes in an agile environment, due to defect turnaround time being faster and since the exact test environment was still in place.
在敏捷的环境中,系统测试更容易检验修补,由于缺陷周转时间较快,并且由于准确的测试环境仍旧适当。
Programmers don't usually have to test whether the user running the program is entitled to read a data file or set the system time.
程序员通常不必测试运行程序的用户是否有权读取数据文件和设置系统时间。
This test scenario compared average user response times, probe response time, system CPU utilization, memory used, and disk utilization at various loads.
该测试场景比较各种负载情况下的平均用户响应时间、探针响应时间、系统cpu利用率、占用的内存和磁盘利用率。
During the development iterations, a subset of stress-related and memory leak defects were removed before the formal system test entry time due to the early testing by the system test core team.
在开发迭代中,由于系统测试核心团队早期的测试,与压力相关的及内存泄漏缺陷的子集在正式的系统测试开始之前就被除掉了。
During this time, the system test application was also basic and simpler; however, it was able to be run under a certain level of stress and duration in order to find defects.
此次,系统测试应用程序还是基本且较简单的,然而,为了找到缺陷,能够在特定压力级别和持续时间内运行。
Because system test executed regression, stress, and duration runs during the iterations, defects were identified and removed very close to the time of injection.
因为在迭代过程中,系统测试执行回归、压力,和持续时间执行,所以在缺陷注入不久就被确定并除去了。
Sequence diagram test cases visualize how the system under test should be interacting with other instances over time.
序列图测试用例显示了,测试之下的系统可以与其他的实例相交流。
Election workers like it because the system allows them to test election procedures, affording them time to iron out flaws.
选站工作者也喜欢先期选举制,这让他们可以对投票过程进行测试,有更多的时间弥补缺陷。
And next year it plans to test a satellite-based system that does not require gantries and can charge according to how congested a road is at that particular time.
明年该局还计划测试一套以卫星定位为基础的收费系统,这样就不用建立公路收费站,只需根据特定时段这条公路的拥挤状况来进行收费。
How could testers remain involved in the requirements elicitation activity while immersed in system, integration, and user acceptance test, all at the same time?
测试人员如何能够仍旧参与需求启发活动,同时又浸入系统、集成,和用户体验测试?
For example, in the case of the system under test, time was a much higher priority than server space.
例如,拿被测试的系统来说,时间要远远优先于服务器空间。
Note that at the time of this writing, the final system test iteration has not yet been entered.
注意写到此时,最终的系统测试迭代还没有开始。
That way, the Response Time Breakdown data for each of the servers in the system under test could be displayed in this report.
这样的话,系统中正在测试的每一个服务器的ResponseTime Breakdown的数据都会显示在报告中。
These successes lead led to the anticipated benefits of improved full software verification team (SVT) ramp-up time and improved product quality at full system test entry.
这些成功导致(led)了在完整的系统测试开始时改进了的完整的软件验证团队(SVT)的加速的时间,以及改进了的产品质量的预期好处。
In J2EE performance testing, a tremendous amount of time and effort have been spent setting up the System Under test (SUT) and workload driver.
在J2EE性能测试中,需要花大量的时间和精力来设置SystemUnderTest (SUT)和工作负载驱动程序。
To ensure precise correlation, synchronize the system time on the Rational Performance Tester host controller, agent, and all servers under test.
为了确保联系精确,将RationalPerformance Tester主机控制器,代理以及测试下所有服务器上的时间调至同步化。
Based on the information in the charts and from other test data, we divided the probe response time values into a rating system. We used the classifications used by Server.Planner and we considered.
根据图表显示的信息和其他测试数据,我们可以将探针响应时间值划分为不同的等级。
Response time breakdown shows how much time was spent in each part of the system under test.
响应时间分解会显示出被测系统的每个部分花费了多少时间。
应用推荐