It is a formulaic calculation based on various components of system load.
它根据系统负载的各个组成使用公式进行计算。
When calculating system load, only Concurrent users need to be considered.
在计算系统负载时,只有Concurrent用户需要被考虑。
A system load analysis model for user concurrent accessing is established.
构建了用户并发访问过程的系统负载分析模型。
The pattern also avoids additional system load by avoiding retries from users.
这种模式还通过减少用户的重试次数降低了系统的负担。
New caching technologies improve the performance of dynamic page generation and reduce system load.
新的缓存技术将改善动态页面的生成和减少系统负载。
No effort is required by the administrator to evaluate system load or to arrange the processing schedule.
管理员不需要评估系统负载或作业处理时间。
When possible, you should schedule data loads and merges to happen when the system load is at its minimum.
如果可能,应该在系统负载最低时安排数据加载和合并。
You should enforce a few limits in mysqld to ensure that the system load doesn't cause resource starvations.
您可以在mysqld中强制一些限制来确保系统负载不会导致资源耗尽的情况出现。
Power system load forecasting using stochastic system state model identification technique is proposed.
本文将随机系统状态模型辨识技术用于电力系统负荷预报。
On the basis of the system load forecasting, a method of node load pattern forecasting has been presented.
在总体负荷预报的基础上提出了节点负荷模式预报的方法。
Heavy system load and a variety of other factors can affect when Firefox receives the mouse move and keyboard events.
超负荷的系统加载和各种其他因素会影响Firefox接收鼠标移动和键盘事件。
CAI enables you to defer the time consuming parts of the deletion to a date when the system load is not on a high level.
CAI允许您将消耗时间的删除部分延迟到系统负载不是很高的时候。
Each machine should process a share of the total system load that is proportional to the processing power of the machine.
每台计算机应该处理总系统负载中一定比例的负载,具体取决于该计算机的处理能力。
The administrators are no longer burdened with determining system load and scheduling times for available system resources.
管理员不再需要判断系统负载并根据可用的系统资源决定调度时间。
Power system load forecasting process, short-term forecasting, considering the weather, human comfort and other factors.
说明:电力系统负荷预测程序,短期预测,考虑天气、人体舒适度等因素。
Knowing how much hard disk space is left or the system load on a server is essential before you begin installing other applications.
在开始安装其他应用程序前,务必知道剩下的硬盘空间或服务器上的系统负载。
An example of the algorithm's application in electric power system load forecasting is shown and compared with standard BP algorithm.
文中给出了这种算法在电力系统负荷预测中的实际应用,并与标准BP算法作了比较。
In distributed systems, the application of process migration has improved system load balancing and realized efficient fault tolerance.
进程迁移在分布式系统中的应用,提高了系统的负载平衡,实现了高效的容错性能。
Furthermore, as the character of the system load changes over time, the cache rebalances, retaining resources that are currently most valuable.
此外,当系统的负载随着时间而变化时,缓存也会重新计算以保留最有价值的资源。
Multiple job queue devices can be created to increase the number of simultaneous jobs processed, and thus increase the system load and throughput.
通过创建多个作业队列设备,可以增加同时处理的作业数量,由此增加系统负载和吞吐量。
Consider being able to have access to a chart that displays both the average system load, as well as the load your process is generating on your system.
考虑到这一点,我们需要能够在一张图中显示系统平均负载和进程加载后产生的负载。
ChordStats produces a similar sound environment with the addition of tones, instrument sound characteristics, and harmony creation based on system load.
chordStats用添加音调的方法生成类似的声音环境,配备声音特征,并且根据系统负载创建和声。
The system marginal price represents the system load situation and thus reflects the congestion status of transmission equipment in a certain extent.
系统边际电价反映了系统负荷的大小,在一定程度上反映了输电设备的拥挤状况。
This object contains the data identifying either the initial load device (its key) or the boot service that requested the last operating system load.
这个对象包含的数据,或是用于识别初始化装载设备(其关键值),或是用于识别上次操作系统装载时请求的引导服务。
In this paper, the method of weighted least square estimate is proposed to construct ARMA model, which can be applied in power system load forecasting.
采用加权最小二乘法参数估计方法,得到应用于电力系统日负荷预测和月负荷预测的ARMA模型。
By analyzing the mathematic model of the hydraulic system and system load, the virtual prototype of hydraulic support system was built in ADAMS environment.
通过分析液压系统以及系统载荷的数学模型,在ADAMS环境下建立了某液压支撑平台系统的虚拟样机模型。
Electric power system load forecasting is one of important operations in dispatching, demanding, scheduling and planning of power system management sectors.
电力负荷预测是电力系统调度、用电、计划、规划等管理部门的重要工作之一。
Power system load forecast, which is the base of power market technique supporting system, is an essential part of power system operation, control and planning.
电力系统负荷预测是电力系统运行、控制和规划不可缺少的一部分,是电力市场技术支持系统的基础。
Power system load forecast, which is the base of power market technique supporting system, is an essential part of power system operation, control and planning.
电力系统负荷预测是电力系统运行、控制和规划不可缺少的一部分,是电力市场技术支持系统的基础。
应用推荐