The whole structure of the unit was involved, and the applied equipment of waste heat of exhaust gas, a new evaporator and generator was also designed.
简要说明了机组整体的布置,并设计了实用型尾气余热利用装置以及新型蒸发器和发生器。
A data sampling system used for on-line monitoring the condition of turbo-generator unit is introduced. The hardware structure, work principle and main function of the system is analyzed.
介绍了汽轮发电机组振动在线状态监测系统数据采集器的硬件构成、工作原理和主要功能。
A data sampling system used for on-line monitoring the condition of turbo-generator unit is introduced. The hardware structure, work principle and main function of the system is analyzed.
介绍了汽轮发电机组振动在线状态监测系统数据采集器的硬件构成、工作原理和主要功能。
应用推荐