Conclusions: Commonplace fixation damaged fracture blood circulation, had stress shield and concentration of the stress. It's failure rate was high.
结论:普通钢板内固定术破坏了骨折端血运,存在应力遮挡和应力集中,失败率高。
Usual treatment is a gum shield, though some people grind through these. If teeth-grinding is caused by stress, then the cause should be addressed.
通常的治疗是戴一个牙龈保护罩,虽然有一些人也会磨穿保护罩。如果磨牙是由于压力引起的,那就设法缓解压力。
If your office environment or your colleagues stress you out, learn to make a "shield" so they won't affect you.
如果你的工作环境或你的同事快把你逼疯了,学着保护自己,让他们影响不了你。
The variation of stress state and strain state induced by tunnel shield driving in soils is studied, and the variation of soil mechanical properties is studied too in this paper.
本文主要研究隧道盾构掘进施工中周围受扰动土体应力状态和应变状态的变异,以及由土体应力状态和应变状态的改变引起土体力学性质变异的特性。
When the method of stress releasing is adopted to model shield-driven, it is very important to determine the coefficient of stress releasing before lining is built.
采用应力释放法模拟盾构法隧道开挖时,合理地确定生成衬砌前的应力释放系数是至关重要的,它对地表变形以及衬砌内力的影响非常明显。
As the shield tunneling method is more and more widely used recent years, the study on the stress of the segments is being more important.
近年来,盾构法施工在地下工程中的应用日益广泛,因而,盾构隧道衬砌结构受力状况的研究也更显重要。
The depletion mode portion is gated by the second gate, and has been modified to operate in depletion mode and that is operative to shield the first gate from voltage stress.
该耗尽模式部分由该第二栅极栅控,并且适于工作于耗尽模式且可屏蔽该第一栅极免受电压负荷影响。
It is a technical difficulty to control the deformation and the stress condition of the structure of large-scale shield shaft in over-river shield tunnel project.
控制超大盾构工作井的变形和结构受力状态是跨江跨海盾构隧道工程设计和施工的技术难点。
It is a technical difficulty to control the deformation and the stress condition of the structure of large-scale shield shaft in over-river shield tunnel project.
控制超大盾构工作井的变形和结构受力状态是跨江跨海盾构隧道工程设计和施工的技术难点。
应用推荐