• A fourth new application was the temporary sealing of a 305-m perforated oil-producing zone to stop severe lost circulation during a workover to drill deeper and to set a liner across a new zone.

    第四新的申请暂时封闭305射孔油区,阻止严重堵漏修井更深班轮跨越一个新的区。

    youdao

  • A fourth new application was the temporary sealing of a 305-m perforated oil-producing zone to stop severe lost circulation during a workover to drill deeper and to set a liner across a new zone.

    第四新的申请暂时封闭305射孔油区,阻止严重堵漏修井更深班轮跨越一个新的区。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定