Step 8: Identify Run-time patterns
第 8步:识别运行时模式
Extending the Configured Model (Step 8-9).
扩展配置的模型(步骤8 - 9)。
Step 8: Telnet/deploy on WAS and restart
步骤8:WAS上的远程登陆/部署和重新启动
Step 8 - Creating required groups and users.
步骤8-创建所需的组和用户。
amqzscix = Switchload file created in Step 8.
amqzscix 是在第 8步中创建的switchload文件。
Go to Step 8: Map security roles to users or groups.
转到Step 8:Mapsecurityroles tousersor groups。
Step 8: Configure Service Registry with the life cycle.
步骤8:使用生命周期配置Serviceregistry。
Step 8: Enable the MQT to be considered for optimization.
步骤8:允许为优化考虑mqt。
Step 8: Business Activity checks which tasks have completed.
第8步:业务活动检查哪些任务已经完成。
Restore the deployment manager configuration you backed up in Step 8.
恢复您在步骤8中备份的部署管理器配置。
Step 8: Integrate the patterns and any packages selected into the solution.
步骤8:将这些模式和所选的任何包集成进解决方案中。
Notice in step 8 of Figure 3 that a FAILURE signal is sent back to the controller.
注意图3的步骤8中FAILURE信号被发送回控制器中。
Refer to Option 1 Step 8 on how to use ifxclone utility to re-set up RSS and HDR.
参阅选项1 -步骤8了解如何使用ifxclone实用工具来重新设置RSS和HDR。
Step 8: Apply the opposite diagonal motion blur to the other Star Diffusion layer.
第八步:在另一个星光柔化图层上使用相反对角线的动态模糊效果。
Refer to Step 8 in Export the schema for the actions to determine the targetNamespace value.
要确定targetnamespace值,请参见导出操作的模式中的步骤8。
Now that our portlets have been successfully installed, we will add them to the page we created in step 8.
现在已经成功的安装了我们的portlet,下面把它们添加到步骤8中创建的页面中。
Step 8 - It is also possible for the stock to gap up on the following day due to overall market strength.
第8步-也有可能对股市的差距翌日由于整体市场的实力了。
Step 8 - It is also possible for the stock to gap down on the following day due to overall market weakness.
第8步-也有可能对股市下跌的差距在第二天由于整体市场的疲软。
Step 8: nourishing: chocolate SPA nourishing repair. Apply chocolate SPA cream, spread it on the whole body.
第八步:滋润:巧克力spa滋养修复,取巧克力spa乳霜,涂抹于全身。
Now I again check to see if the 8-byte parity-fixed block of Step 10 is a weak key (just like I did in Step 8).
现在再次检查第10步得到的经过奇偶修正的8字节块是不是弱密钥(就像在第8步中所做的那样)。
However, in the present formulation, the decision maker is an intrinsic part of the algorithm, (i. e., Step 8).
然而,在目前的措辞,决策者是该算法的内在组成部分,(即第8步)。
For example, in Step 8, the RentalLocation is asked to meet its responsibility of determining what vehicles are available.
例如,在第八步中,租借地点要决定在这个地点,哪些汽车是可用的。
Suppose that the Update Software Stack scenario will no longer include Step 8 as a consequence of a change in the process.
假设update Software Stack不再包括过程中的步骤8。
Step 8: the second JBI environment receives the request and forwards it to the BC connected with the first JBI environment.
第8步:第二个JBI环境接收请求,并将它发送到连接第一个JBI环境的BC。
When step 8 above is complete, an Eclipse project is created containing the code in the apps module of the Apache Wink examples.
步骤8完成后,将创建一个Eclipse项目,它包含ApacheWink示例的apps模块中的代码。
Suppose that the Update software stack scenario was not to include Step 8 anymore, as a consequence of a change in the process.
假设由于过程中的变更更新软件栈(Update software stack)场景将不再包含步骤8。
Now cd to the directory with the executable you created in step 8 and run some tests (such as /tmp/mpich-1.2.6/bin/mpicc -np 4 xhpl).
现在cd到在步骤8 中所创建的可执行程序所在的目录,并运行一些测试(例如 /tmp/mpich-1.2.6/bin/mpicc -np4 xhpl)。
Step 8: Stay well clear of train tracks and do not walk on them to find the nearest station, as trains can approach without warning.
远离轨道,不要在铁轨上行走寻找最近火车站——火车会毫无预兆的驶过。 缾。
In the dependency Selection window, look for the Dojo dependency (shown at the top of the list in Figure 3), and if present, go to step 8.
在DependencySelection窗口中,查找Dojo依赖项(如图3中列表的顶部所示);如果找到该依赖项,则转到第8步。
In the dependency Selection window, look for the Dojo dependency (shown at the top of the list in Figure 3), and if present, go to step 8.
在DependencySelection窗口中,查找Dojo依赖项(如图3中列表的顶部所示);如果找到该依赖项,则转到第8步。
应用推荐