• Measurement of super long stayed cable tension using vibration method is investigated.

    研究超长斜拉索张力的振动测试方法。

    youdao

  • Cable-stayed bridge and stayed cable are obviously geometrically nonlinear structures.

    斜拉桥和斜拉索是几何非线性明显的结构。

    youdao

  • Stayed cable is very vulnerable to vibration as it is with low rigidity, low damping ratio and light weight.

    由于斜拉索刚度小、阻尼低、质量轻,极易发生振动。

    youdao

  • And damage situation of cable-stayed cable is simulated by using RBF network based on finite element model in ANSYS.

    基于ANSYS有限元模型,采用RBF网络,模拟了斜拉索的损伤情况。

    youdao

  • The results show that using prestressed reinforcing rebar in stayed cable anchorage is reliable, simple and durable.

    结果表明,采用预应力粗钢筋作为斜拉索锚固的方式具有锚固可靠、操作简便、耐久性好的特点。

    youdao

  • Orientation method for cable-stayed cable damage and the degree of cable-stayed cable damage based on a model bridge is probed.

    以一模型桥为背景,探讨了斜拉索损伤定位以及损伤程度确定的方法。

    youdao

  • The complicated structure incorporates a reinforced concrete structure and a spatial steel structure with a stayed cable structure.

    各楼层的梁板柱(包括悬挂斜拉索的立柱)为钢筋混凝土结构。

    youdao

  • Technic improvements in process of stayed cable installation efficiently protect PE cable, and enhance work efficiency and security.

    斜拉索安装工艺改进后,有效地保护了斜拉索层,提高了工作效率和安全性。

    youdao

  • Three methods often used in analyzing stayed cable are analytic method, equivalent two force members method and finite element method.

    斜拉索静力分析的常用的方法有:解析法、二力杆法和有限元法。

    youdao

  • The research on the large-amplitude vibration suppression of stayed cable under wind excited by controlling support axial motion was carried out in this paper.

    主要研究通过对拉索支座的轴向运动进行控制以减小风荷载作用下拉索振动。

    youdao

  • A method of two cable-nip traction is first applied when large tonnage cables are installed, all these decrease draught force of leading chain, and avoid surging for stayed cable efficiently.

    在塔上安装大吨位的斜拉索时首次采用两道索夹牵引的方法,减小了导链引索的引力,有效避免了斜拉索的滑脱。

    youdao

  • Nonlinear finite element program of stayed cable based on the elastic catenary element is programmed. The analytic analysis and finite element analysis of different stayed cables are compared.

    编制了基于弹性悬链线单元的斜拉索的非线性有限元分析程序,比较了斜拉索的悬链线解析解、抛物线解析解和基于弹性悬链线单元的有限元解的计算结果。

    youdao

  • The Puente de la Mujer, like the Sundial Bridge, is a cantilever spar cable-stayed design.

    与日晷桥一样,女人桥采用的也是斜拉桥设计方案。

    youdao

  • It is big, though, with an 800-meter-long-main span that's the largest for a cable-stayed bridge in the nation, and the fifth largest globally.

    这座长800米的大桥是该国最长,世界第五长的斜拉索桥。

    youdao

  • Building a bridge in the Yangtze River meant breaking another record-at 120 meters, the Sutong has the deepest foundation of any cable-stayed bridge.

    在扬子江上建造桥梁同时也意味着打破了另一项记录:苏通大桥拥有超过任何斜张桥的120米深桥基。

    youdao

  • Background: This massive structure, which mixes cable-stayed spans and typical highway bridge elements, opened in 2008 after nearly 10 years of planning.

    背景:这个庞大的建筑物融合了斜拉桥桥墩和典型的公路桥元素,筹划了接近10年之久,在2008年开通。

    youdao

  • It took immense audacity to build a cable-stayed road-bridge spanning the valley of the river Tarn, near Millau, southern France.

    建造这样一座横跨法国南部米约附近的塔恩河河谷的巨大斜拉桥需要惊人的勇气。

    youdao

  • The height of the poles is 100 m yet. Soon it will be 320 m. And it will become the world's biggest cable-stayed bridge.

    目前桥两端长度已达100米,很快它将达到320米,并将成为世界上最大的斜拉桥。

    youdao

  • To construct the 1, 060-foot-long arch, they cast 24 feet of concrete at a time, while a separate, temporary cable-stayed bridge held up the unfinished ends until the gap was closed this year.

    为了建造1060英尺长的拱结构,他们每次要浇铸24英尺长的混凝土块,与此同时,缆绳牵引的桥段的两端会在明年会合人。

    youdao

  • Even more visible, though, is the Sutong Bridge, which at 1088 meters (3570 feet) is the world's longest cable-stayed bridge, and the first whose main span exceeds 1000 meters.

    尽管如此,更加夺人目光的是1088米长(苏通大桥全长32.4公里——译注)的苏通长江大桥,这是世界最长的斜张桥,而且也是第一座主跨部分超过1000米的大桥。

    youdao

  • Some people only stayed in one of the restaurants near the cable car station, but we wanted also to do some physical activity.

    有些人只想待在缆车站附近的一家餐馆里,而我们小俩口则想做些体能运动。

    youdao

  • Harbin sifangtai bridge is a cable-stayed bridge whose girder is composed by steel i-beam above and concrete deck slab below.

    作为叠合梁斜拉桥,四方台大桥的主梁由下部的工字钢和上部的混凝土行车道板组合而成。

    youdao

  • Based on the cable-stayed bridge using method of cantilever, the paper establishes the optimization model of construction phase with multi-objective and multi-constraint and gives the example.

    采用多目标、多约束的优化方法,以悬臂施工主梁的斜拉桥为例,建立了施工阶段的优化模型,并给出算例。

    youdao

  • Possibility and efficiency in the application of this method to large finite element analysis are illustrated by an example of the stress analysis for a section of a cable stayed bridge.

    以斜拉桥桥段的应力分析为例,说明在大型有限元分析中采用分阶段计算方法的可能性和有效性。

    youdao

  • One of the most noticeable structrual differences between the cable-stayed bridge and the truss and girder types lies in the field of flexibility .

    斜拉桥与桁架和梁式类型桥之间,在结构上的一个最显著不同之处,在于柔度方面。

    youdao

  • The special architectural form leads to many difficulties in structural design, in which cable-stayed structure is used in railway station for the first time.

    由于是第一次在火车站站房中使用斜拉索结构,其奇特的建筑造型,给结构设计带来很多困难。

    youdao

  • Up to date, when designing the reasonable cable forces of cable-stayed Bridges, the special Bridges design process is adopted.

    目前,在进行斜拉桥合理成桥状态设计时,通常都是采用专用桥梁设计程序。

    youdao

  • Up to date, when designing the reasonable cable forces of cable-stayed Bridges, the special Bridges design process is adopted.

    目前,在进行斜拉桥合理成桥状态设计时,通常都是采用专用桥梁设计程序。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定