• From a template, you can create and start a process or task instance and work with it.

    可以模板创建启动一个流程任务实例并对其加以利用。

    youdao

  • Process Choreographer USES staff plug-ins to determine who can start a process or claim an activity.

    Process Choreographer使用人员插件决定可以启动流程声明活动。

    youdao

  • Each input criterion defines a particular combination of inputs that can start a process, service, or task.

    每个输入标准定义特殊输入组合这些组合可以启动流程服务任务。

    youdao

  • By drilling and fracturing the rock they believe they can start a process to increase the absorption rate by 100,000 times or more.

    他们相信借助于钻孔破碎岩石,他们可以创造一个把二氧化碳吸收率提高100000更多进程

    youdao

  • The process initiating portlet displays a form enabling the end user to enter data and a Submit button to start a process instance.

    流程启动Portlet显示允许最终用户输入数据表单用于启动流程实例Submit按钮

    youdao

  • The portlet developer should use a generated and adopted Web service or EJB Interface to start a process instance instead of the generic EJB interface.

    Portlet开发人员应该使用一个已经生成获得采用Web服务EJB接口启动流程实例而不是通用 EJB 接口。

    youdao

  • In the first mode, called init in this article, the user wants to start a process through a human task and does so by entering and then submitting initial data.

    第一种模式本文将其称为发起)中,用户希望通过人工任务启动某个流程通过输入初始数据然后提交数据来实现这一点。

    youdao

  • If you happen to start a process and realize that it should run at a different priority, there is a way to change it after it has started, using the renice command.

    如果正好启动进程,但意识应该不同优先级运行,那么一种方法可以启动之后对其进行更改,即使用renice命令。

    youdao

  • In cases where a Lotus form has been provided to start a process, a new option from the Projects menu enables you to generate a new process from a form, as shown in Figure 20.

    对于LotusForm启动过程的场景,Projects菜单中的一个选项允许表单生成新过程,20

    youdao

  • This new capability would allow you to start a new process instance using the same data as the in-flight instance, then jump forward to the right spot.

    这个功能允许使用正在进行实例中的相同数据启动新的流程实例,然后向前跳转正确的执行

    youdao

  • You can start a document in a process during importing the document.

    导入文档的时候可以过程开始一个文档。

    youdao

  • The interactions window lets you start a debugging process through an arbitrary expression evaluation.

    交互式窗口使能够通过任意表达式评估来启动调试流程

    youdao

  • Even five years ago people were saying this is science fiction this is fantasy. It is the start of a long process.

    甚至年前人们都一直在说虚构,是幻想现在它仅是一个漫长过程开端

    youdao

  • The main purpose of the consumer layer is to gather all the information required to be able to start a business process or transaction.

    使用者主要目的收集所需所有信息以便启动业务流程事务。

    youdao

  • Each branch in a process must begin with a start node or by receiving data as input.

    流程中的每个分支必须开始节点作为开端或是将接收数据作为输入。

    youdao

  • This copying might not have been very accurate, but it was enough to start a new evolutionary process.

    这种复制未必精确已经足以引发一种新的进化过程

    youdao

  • Will it be seen as the end of a process, or the start of a new round, aimed at deeper cuts, and a new era in arms control?

    或是新一轮削减更多核弹头进程开始以及一个核武控制时期的到来?

    youdao

  • If you did not use exec, the JVM would start as a child process of the shell that is executing the run script.

    如果没有使用exec,那么jvm作为执行run脚本外壳个子进程启动

    youdao

  • The following code snippet of StartProcessServlet in the sample demonstrates how to start a business process instance.

    下面StartProcessServlet代码片断简单演示了如何启动业务流程实例

    youdao

  • However, the semantics of start nodes in Business Modeler specifies that all start nodes of a process model execute at once.

    不过Business Modeler各个开始节点语义规定流程模型所有开始节点都是立即执行的。

    youdao

  • Use the WebSphere Scheduler to regularly start a business process calling the backend services.

    使用WebSphereScheduler定期启动一个调用端服务的业务过程

    youdao

  • A new enhancement in V6.2 enables you generate an originating task as well, so that the human task interface can be used to start a new process instance.

    中的一个新的增强功能使可以生成发起任务以便可以使用人工任务界面启动新的流程实例。

    youdao

  • As Figure 3 shows, Bonita automatically adds three BPMN elements while creating a new process: start, a transition, and an activity named Step1.

    如图3所示,Bonita创建流程时自动添加三个BPMN元素开始迁移名为step1的活动

    youdao

  • To start a workflow, click process Templates on the left, and check the process template you want to run, as shown in Figure 27.

    启动一个工作流单击左边ProcessTemplates选中运行流程模板如图27所示。

    youdao

  • CreateController allows you to enter some data used to start a new process Server process.

    CreateController允许输入一些用于开始ProcessServer流程数据

    youdao

  • The process beginning is indicated with a start event, while the process end is marked with an end event.

    流程开始由startevent指示流程末尾标记为end event。

    youdao

  • The process begins with a Start event and ends with an event, which we named process end event.

    流程Startevent开始一个名为processEnd event的事件结尾。

    youdao

  • If you selected a start date for a time in the future, the deployment process will begin at the specified time.

    如果选择将来某个时间作为开始日期,那么这个部署过程这个指定时间开始

    youdao

  • You start the process by having a consultation with one of their consultants about your needs and the correct package to fit those needs.

    可以开始于从他们顾问那里得到个建议,是关于需求满足需求的恰当的服务套装

    youdao

  • It provides a straightforward API with methods to start and end a document, process elements, and add text or attributes.

    提供了一个直观API通过各种方法开始结束文档处理元素以及添加文本属性

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定