Lewis will compete in both sprints in Stuttgart.
刘易斯将参加在斯图加特举行的两项短程赛。
Establish iterations, called "sprints".
建立名为“sprints”的迭代。
Scrum processes are organized in iterations also referred to as sprints.
Scrum过程的组织迭代形式也被称为“冲刺”。
The trouble, though, is that America's forces were designed for sprints, not marathons.
然而,问题是,美军是被设计来跑短跑的,而不是跑马拉松的。
Efficiently plan multiple releases and sprints via an electric whiteboard interface
使用电子白板界面同时制定多个版本的发布计划,提高效率。
I served with the Marines one weekend a month and during two-week sprints in the summer.
每月的某个周末和暑期的两个礼拜,我都会参加海军陆战队的训练活动。
Mike Cohn, suggested that the best way to resolve these issues is by synchronizing the sprints.
MikeCohn提出:解决这方面问题,最好的方式就是同步多个sprint。
Your sprints don’t have to be exactly 15 minutes, and your breaks don’t have to be exactly 5 minutes.
你不必每次都工作15分钟,然后休息5分钟。
If we’re working in 4 week sprints, waiting 3 - 4 weeks for regression test results just does not work.
如果我们的Sprint是四周一次,那用三至四周的时间等待回归测试结果就无法令人接受。
Perform usability tests every two-three sprints to make sure new design implementations are well received.
每两到三次Sprint做一次可用性测试,确保新的设计实现没有问题。
Visually track releases and sprints through an interactive Taskboard, Testboard and Daily Scrum dashboard.
通过交互式的任务板(Taskboard)、测试板(Testboard)、每日scrumdashboard来对版本和sprint进行可视化追踪。
Many young entrepreneurs think startups are like sprints, when you just race from the start to the finish line.
许多年轻企业家认为创业就像短跑,从起点冲到终点。
On one such project, he initially started with staggered sprints but soon found out that it was not a good idea.
在一个类似的项目中,刚开始时,他采取了交错安排sprint的方式,不久后就发现这样做效果不佳。
"So try to split up your workday into short sprints of 90 to 120 minutes each, with a 5-minute break in between," Achor says.
阿克尔说:“把一个工作日分成几个时间段,每工作90到120分钟就要休息5分钟。”
For example, you could create an interim simple UI for the first few sprints, and then replace it with a more capable UI later.
例如,你可以在前面的几个sprint中创建临时的简单用户界面,然后再用更完备的用户界面来替换。
Doing high knee sprints will burn more calories as well as increase your heart rate even more than simple running or jogging.
做高膝盖冲刺将消耗更多的卡路里以及增加你的心率,甚至超过简单的跑步或慢跑。
If you can, retreat to a place where you can blow off some steam by doing a few jumping jacks, sit-ups, push-ups or stair sprints.
如果可以的话,去一个人少的地方,在那里你可以通过几个开合跳,仰卧起坐,俯卧撑,跳台阶来宣泄压力。
The internal chaos around the release sprints is almost too large to be handled. This is why we’ve had to keep the sprints in sync.
围绕着发布sprint的内部混乱状况太过难于管理,这也促使我们必须要保证多个sprint同步。
The next step is to plan the timelines for the project, which means that you specify the start and end dates for the release and the sprints.
接下来的一步,是为项目规划时间限制,这意味着您要为发布和冲刺指定起始和截止日期。
Automatically generate key Agile metrics such as Burndown, Velocity, Estimate trends (Burnup) and Cumulative Flow Reports for releases and sprints.
针对版本和sprints的关键敏捷度量数据生成图表,如Burndown、Velocity、Estimatetrends、CumulativeFlowReports。
Keep just the parts of Scrum that make sense in a smaller group: daily standups, short sprints, reviews, retrospectives, visible project burndowns.
保持Scrum中在小团队中有意义的部份:每日站立会议、短迭代、检讨、回顾、burndown。
An iterative approach divides a project into a sequence of short timeboxes called iterations (which are sometimes referred to as "sprints" or "cycles").
迭代方法将项目分为一序列短的时间块,称为迭代(有时候称为“短跑”或“循环”)。
Kenya is to host the Africa Championship games in two years in Nairobi. Okeyo says in anticipation, Kenya is working hard on the sprints and field events.
肯尼亚将于两年后在内罗毕主办非洲冠军赛,奥基欧说,预计肯尼亚在短跑和田赛项目上会付出巨大努力。
Involve the offshore team in the project after couple of sprints, once onsite team has understood the project vision, road map and made key technical choices.
先让本地团队在头几个迭代中理解项目愿景、路线图,并做出关键的技术决策,然后再让离岸团队参与进来。
At the beginning of the sprint, the team collectively estimates the amount of time that will be required for the "maintenance bucket", based on previous sprints.
在sprint的开始,团队会根据上个sprint中的经验,估算出维护工作可能占用的时间。
Endurance is the ability to maintain energy levels for longer periods of time and strength is your ability to sustain a short burst of energy. Marathons and sprints.
耐力是一种能较长时间保持精力的能力,而体力是能够短时间维持精力的一种能力,就像马拉松和短跑一样。
This might seem counter-intuitive; after all, according to some, limiting sprints at two to four weeks eliminates the ability to handle large pieces of functionality.
这可能违反直觉;毕竟依照一些说法,限制在2 周到4周之内的sprint 不能处理大型功能。
The most common use of nested sprints is when the various teams on the project cannot agree on a common sprint length, with some wanting two-week sprints and others wanting four-week sprints.
嵌套式的sprint最常用的情况是:项目的不同团队无法就同一个sprint长度达成一致,可能有些需要两周的sprint,有些需要四周的sprint。
The most common use of nested sprints is when the various teams on the project cannot agree on a common sprint length, with some wanting two-week sprints and others wanting four-week sprints.
嵌套式的sprint最常用的情况是:项目的不同团队无法就同一个sprint长度达成一致,可能有些需要两周的sprint,有些需要四周的sprint。
应用推荐