The dam builders underestimate the risk of spillway failure.
水坝工程师低估了泄洪道失控的风险。
Water pouring over the spillway appears white, likely resulting from its rapid flow.
泄洪渠上的水流呈现出白色,估计是快速流动的关系。
Completion of the spillway was expected to reduce the risk of such a catastrophic event.
预计泄洪渠的完成能够降低发生这种灾难性事件的风险。
One of the spillway gantries was slightly damaged. However, all gates could be opened after the shaking.
一个泄水口的龙门吊受到轻微破坏,所有闸门在震后都可以开闸放水。
Opening a channel, the Morganza spillway, is meant to relieve pressure on the levees protecting the cities of Baton Rouge and New Orleans.
打开莫干扎分洪道(Morganza Spillway)是为了缓解巴吞鲁日和新奥尔良的堤坝压力。
The calculation results verified the feasibility of the flexible spillway.
从而验证了柔性溢洪道的可行性。
As "bottlenecks" in the earth dam, the selection of the spillway is crucial.
作为土石坝的“卡脖子”工程,溢洪道方案的选择至关重要。
Its revised design flood is 40 % higher than its existing spillway capacity.
该水库修改后的设计洪水将比现有溢洪道泄洪能力提高40%。
The axial line of spillway is straight in great majority of hydraulic works.
绝大多数工程中溢洪道按直线布置。
The paleo-weathering crust control distortion and destruction of spillway rock mass.
古风化壳对两岸岸坡岩体的变形破坏起控制作用。
The geological condition of the spillway at Gongbo Gorge Hydropower Station was very complicated.
公伯峡水电站溢洪道工程地质条件复杂。
Sliding occurred in the slope side of spillway on the right bank after the spillway was excavated.
大水沟水库溢洪道开挖后,右岸边坡发生了滑动失稳。
Blasting demolition of thin RC weir surface and mortared rubble is directly conducted on spillway dam.
溢流坝堰面的薄层钢筋混凝土和浆砌块石的爆破拆除直接在坝体上进行。
The spillway would allow them to break contact with their pursuers-then he could get back to his mission.
溢洪道能让陆战队们甩掉追兵——然后他就能继续执行自己的任务了。
The crack repairing by epoxy mortar facing on the spillway of the Xin′anjiang Power Plant was made 40 years ago.
新安江水电站溢流面采用环氧砂浆进行裂缝修补已40年,是我国较早采用环氧砂浆进行修补的工程。
One of the main problems of spillway tunnel with large discharge and high velocity flow is the cavitation damage.
高水头、大流量泄洪洞内高速水流问题主要问题之一是水流空化引起过流表面空蚀。
The watertight seal of Changzhuang reservoir spillway tunnel is irregular and ageing, having caused severe leakage.
常庄水库泄洪洞伸缩缝极不规则且止水均已老化,渗漏严重。
The concrete placement for spillway and overflow weir at Dongba Hydropower Station employs light truss type formwork.
洞巴水电站溢洪道溢流堰的混凝土浇筑使用轻型桁架模板。
The pier arrangement on spillway crest with sloping upstream face is studied by 310 sets of experiments in the paper.
本文通过310组试验,研究了上游面倾斜的溢流坝的闸墩布置。
The discharge capacity of shaft spillway with framed inlet tower used for high tailings dam is studied by physical model.
介绍了用于高尾矿坝的具有圆形框架式进水塔的竖井排洪道泄流能力模型试验研究。
Stepped spillway is one of the new kinds of the spillways with high rate of energy loss, which is based on RCC technique .
台阶式溢洪道是结合RCC技术提出的一种具有高消能率的溢洪道新形式。
Technical solutions include dam reinforcement, spillway capacity increase and temporary storage of water in large reservoirs.
技术方案包括大坝加固、溢洪道泄洪能力提升和临时储水设施。
The outer bulging step energy dissipater is one type energy dissipater in chute spillway, and has been applied in water projects.
外凸型阶梯式消能工是应用于溢洪道陡槽段上的一种新型的辅助消能工。
Culvert and horizontal pipes and spillway with hatch control need management of person specially assigned when flood is discharged.
涵、卧管和有闸门控制的溢洪道,在泄洪运行时需要专人管理;
The Xiaoshan Hydropower Station consists of reinforced concrete face rockfill dam, bank spillway, diversion system and power house.
小山水电站工程由钢筋混凝土面板堆石坝、岸坡溢洪道、引水系统及发电厂房组成。
Using the variable domain finite element method, the problem of the flow over a gated or free spillway has been solved successfully.
本文利用变区域上变分有限元方法求解了溢流坝自由溢流和闸下出流问题。
The vertical vortex frequently occurs at hydraulic intakes such as diversion pipeline, diversion tunnel, spillway and pumping station.
立轴旋涡在水电站引水管道、导流隧洞、溢洪道、水泵站等进水口前时有发生。
In combination with Shapai and Wawushan projects, the hydraulics 'characteristics of vortex shaft spillway have been tested and studied.
结合沙牌等工程对旋涡式竖井溢洪道的水力学特性进行了试验研究。
The right bank spillway tunnel at Lubuge hydropower station is the most important passageway of water discharging and sediment flushing.
鲁布革水电站右岸泄洪洞承担着鲁布革大坝泄洪、排沙、放空水库的任务,是最重要的泄洪、排沙通道。
The right bank spillway tunnel at Lubuge hydropower station is the most important passageway of water discharging and sediment flushing.
鲁布革水电站右岸泄洪洞承担着鲁布革大坝泄洪、排沙、放空水库的任务,是最重要的泄洪、排沙通道。
应用推荐