Each part of the software project estimation must use certain management methods. Appropriate management methods can raise the accuracy of the software project estimation.
软件项目估算的每一个部分都要用到一定的估算管理方法,良好的估算管理方法可以提高软件项目估算的准确度。
Selecting the best technique or combination of estimation methods to apply to a project has become a large problem for software teams.
对于软件团队来说,一个很大的问题是在项目中选择哪些最佳的技术或者评估方法的组合。
The key differences in estimation activities on an iterative software development project versus one governed by a waterfall approach are.
迭代软件开发项目的评估活动与瀑布方法的主要不同之处是。
If you have cooked the same dish many times before, you can follow a recipe with confidence. Similarly, estimation for a software project is easy if you can meet the following criteria.
如果一道菜您之前已经做过很多次了,您可以很自信的照着菜谱做。
Software cost estimation is an important process of managing software and also the difficult issue in software project planning.
软件成本估算是软件项目管理的关键步骤,也是软件项目计划的难点。
The software estimation makes statistical estimation on the software size of a project.
计算机软件估计对项目的软件规模进行数字上的近似。
Software cost estimation is the most important chain of software project management and is important basement of software cost management, too.
软件成本估算是软件项目管理中的重要环节,也是软件项目成本管理的重要基础和依据。
Introducing the concept of WBS (Work Breakdown Structure) into the project quotation software will greatly improve the accuracy of project cost estimation and the efficiency of cost control.
将项目管理中的WBS(工作分解结构)概念引入到工程报价软件中,将大大提高工程造价计价的准确性和造价控制的效率。
Introducing the concept of WBS (Work Breakdown Structure) into the project quotation software will greatly improve the accuracy of project cost estimation and the efficiency of cost control.
将项目管理中的WBS(工作分解结构)概念引入到工程报价软件中,将大大提高工程造价计价的准确性和造价控制的效率。
应用推荐