Documentary: visual presentation (such as a video, slide show, or computer project) no more than 10 minutes long.
纪实作品:不超过10分钟的视觉展示,例如播放视频,幻灯片或者演示计算机程序。
Explanatory titles are primers - quick summaries of the information on the slide (e.g. "Project costs for 2010 are well within budget").
解释性标题则是引子—快速地总结片子的信息(例如,“2010年成本未超预算”)。
As you edit a project, you may want to add some text to the slide but not have the text appear as a text caption over the slide.
当你在编辑项目时,你可能想要将一些文字加入到幻灯片中,但不想让文字显示为幻灯片上的文本标题。
The new slide is added to your project. You can edit and work with the new slide just like other slides in the project.
新幻灯片随即加入到你的项目中。编辑和使用新幻灯片的方法,和你在项目使用其他幻灯片一样。
You can find a "how to use" guide here and a slide presentation overview of Scala.Net project here.
你可以在这里找到一份“使用指南”和有关Scala.Net项目的幻灯片。
The slide or slides you selected are duplicated and placed in the project. You can edit and work with the new slides just like the original slides.
你选取的幻灯片会直接复制一份并放置到项目中。编辑与使用新幻灯片的方法,与原始幻灯片一样。
You determine the speed at which the mouse moves on any individual slide in a project.
您可以决定鼠标移到项目中任何个别幻灯片的速度。
You cannot adjust the timeline of master slide objects or change their Z-order on a project slide timeline.
你在项目幻灯片的时间轴中不能调整主幻灯片对象的时间表或者改变他的Z顺序。
The full motion recorded movie is placed into one slide of a project and plays like a "mini movie" within the larger project.
全动态录制的影片会存在项目的某幻灯片中,并在较大项目中以迷你影片形态播放。
In the design of standard seawall project, it is necessary to analyze disadvantage scour elevation in concerned river reaches, providing basic data in computing seawall global slide stability.
在进行标准海塘工程初步设计时,通常需要分析在河段江道的不利冲刷高程值,给海塘整体抗滑稳定计算条件组合提供依据。
The other side of the project are so high, such as large-scale slip slide, sand, take the tree -.
那边的项目多得是,比如大型滑滑梯、沙子、走树干——。
Through the slope displacement forecasting of the Three Gorges Project list slope and Xintan slide, the results are satisfied.
通过对三峡升船机高边坡和新滩滑坡实际位移数据进行预测,研究了它们的混沌特征,结果令人满意。
The slide stability of the geomembrane against the interface, will directly effect on the safety of a project operation.
斜坡面上土工膜与结构面的抗滑稳定直接影响到工程的安全运行。
Through numerical computation and analysis, and project practice, it indicated that this technology has good effect in anti-slide and guard against flushes, which is worth promoting its application.
通过数值计算分析,及具体工程的实践,表明该技术具有良好的抗滑和防冲效果,值得推广应用。
Furthermore, other problems as land-slide treatment, blasting project and construction quality check-up are discussed as well.
此外,还就塌方处理,爆破方案,工程质量检查等问题进行了探讨。
By limit equilibrium method and 3-d FEM calculating, this paper simulated the stability and processing project for the earth slide in Baoquan.
通过极限平衡法和三维有限元模拟计算,模拟了宝泉滑坡体的稳定性和工程处理方案。
The proper treatment measures, including drainage, unload, improvement of the earth and retaining project, should be taken according to the characteristic of the land-slide.
滑坡的处理应根据滑坡的不同特点采用相应的处理方法,常用的措施有排水处理、减载与反压、土体改良法、支挡结构抗滑等方法。
SBT series slide way draught machine design is advanced, fabrication is excellent, accuracy is high, mass is easy to be ideal plotting of project planner machinery.
SBT系列导轨绘图桌设计先进,制造精良,精度高、质量好,是工程设计人员的理想绘图机械。
This extra characteristic lets you take pictures and, by pressing a button on the camera, project them onto any nearby surface, in old-school slide show style.
这个额外的功能令你在拍摄照片后,只要按下相机上的一个按钮,就能将照片投影到附近的任何平面上,像老式幻灯片那样。
According to the computing result, in the project, the construction risk of continuous steel truss is the largest, followed by box-girder slide shuttering forms and deepwater foundation.
从计算结果来看,在该项目中,连续钢桁梁施工风险最大,箱梁移动模架施工风险次之,深水基础施工风险最小。
According to the computing result, in the project, the construction risk of continuous steel truss is the largest, followed by box-girder slide shuttering forms and deepwater foundation.
从计算结果来看,在该项目中,连续钢桁梁施工风险最大,箱梁移动模架施工风险次之,深水基础施工风险最小。
应用推荐