• Documentary: visual presentation (such as a video, slide show, or computer project) no more than 10 minutes long.

    纪实作品超过10分钟的视觉展示例如播放视频,幻灯片或者演示计算机程序。

    youdao

  • Explanatory titles are primers - quick summaries of the information on the slide (e.g. "Project costs for 2010 are well within budget").

    解释性标题则引子快速地总结片子信息(例如,“2010年成本未超预算”)。

    youdao

  • As you edit a project, you may want to add some text to the slide but not have the text appear as a text caption over the slide.

    编辑项目时,你可能要将一些文字加入幻灯片中,不想文字显示幻灯片上文本标题

    youdao

  • The new slide is added to your project. You can edit and work with the new slide just like other slides in the project.

    幻灯片随即加入项目中。编辑使用新幻灯片的方法,和你项目使用其他幻灯片一样

    youdao

  • You can find a "how to use" guide here and a slide presentation overview of Scala.Net project here.

    可以在这里找到一份使用指南有关Scala.Net项目幻灯片

    youdao

  • The slide or slides you selected are duplicated and placed in the project. You can edit and work with the new slides just like the original slides.

    选取幻灯片会直接复制一份放置到项目编辑使用幻灯片的方法,与原始幻灯片一样

    youdao

  • You determine the speed at which the mouse moves on any individual slide in a project.

    可以决定鼠标到项目任何个别幻灯片速度

    youdao

  • You cannot adjust the timeline of master slide objects or change their Z-order on a project slide timeline.

    项目幻灯片时间不能调整幻灯片对象的时间表或者改变他的Z顺序

    youdao

  • The full motion recorded movie is placed into one slide of a project and plays like a "mini movie" within the larger project.

    动态录制影片存在项目幻灯片中,较大项目中以迷你影片形态播放

    youdao

  • In the design of standard seawall project, it is necessary to analyze disadvantage scour elevation in concerned river reaches, providing basic data in computing seawall global slide stability.

    进行标准海塘工程初步设计时,通常需要分析河段江道的不利冲刷高程值,海塘整体稳定计算条件组合提供依据。

    youdao

  • The other side of the project are so high, such as large-scale slip slide, sand, take the tree -.

    那边项目比如大型滑梯沙子树干——。

    youdao

  • Through the slope displacement forecasting of the Three Gorges Project list slope and Xintan slide, the results are satisfied.

    通过三峡升船机高边坡滑坡实际位移数据进行预测研究了它们混沌特征,结果令人满意。

    youdao

  • The slide stability of the geomembrane against the interface, will directly effect on the safety of a project operation.

    斜坡面上土工膜与结构面的抗滑稳定直接影响工程安全运行。

    youdao

  • Through numerical computation and analysis, and project practice, it indicated that this technology has good effect in anti-slide and guard against flushes, which is worth promoting its application.

    通过数值计算分析具体工程实践表明技术具有良好抗滑冲效果值得推广应用

    youdao

  • Furthermore, other problems as land-slide treatment, blasting project and construction quality check-up are discussed as well.

    此外,还塌方处理爆破方案工程质量检查问题进行了探讨。

    youdao

  • By limit equilibrium method and 3-d FEM calculating, this paper simulated the stability and processing project for the earth slide in Baoquan.

    通过极限平衡三维有限元模拟计算模拟了宝泉滑坡体的稳定性工程处理方案。

    youdao

  • The proper treatment measures, including drainage, unload, improvement of the earth and retaining project, should be taken according to the characteristic of the land-slide.

    滑坡处理根据滑坡不同特点采用相应的处理方法,常用的措施排水处理、载与反压、土体改良法、支结构抗滑等方法。

    youdao

  • SBT series slide way draught machine design is advanced, fabrication is excellent, accuracy is high, mass is easy to be ideal plotting of project planner machinery.

    SBT系列导轨绘图设计先进制造精良精度质量好,工程设计人员理想绘图机械

    youdao

  • This extra characteristic lets you take pictures and, by pressing a button on the camera, project them onto any nearby surface, in old-school slide show style.

    这个额外的功能拍摄照片后,只要相机一个按钮,就能将照片投影附近任何平面上,像老式幻灯片那样。

    youdao

  • According to the computing result, in the project, the construction risk of continuous steel truss is the largest, followed by box-girder slide shuttering forms and deepwater foundation.

    计算结果来看项目中,连续桁梁施工风险最大箱梁移动模架施工风险次之,深水基础施工风险最小。

    youdao

  • According to the computing result, in the project, the construction risk of continuous steel truss is the largest, followed by box-girder slide shuttering forms and deepwater foundation.

    计算结果来看项目中,连续桁梁施工风险最大箱梁移动模架施工风险次之,深水基础施工风险最小。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定