By means of Lagrange multiplier method, this method distributes the slack to the operator nodes in the data path, thus, efficiently reduces the energy consumption of design circuit.
应用拉格朗日乘数法,将空闲时间分布到数据通路的各个操作节点上,从而有效地降低了设计电路的能耗。
This paper introduces a new method of determining the critical path of the network chart-node slack method.
介绍了一种确定网络图关键线路的新方法——结点时差法。
This paper introduces a new method of determining the critical path of the network chart-node slack method.
介绍了一种确定网络图关键线路的新方法——结点时差法。
应用推荐