The slab floor was designed to be elevated on a steel frame which rests on 14 concrete piers.
楼板的设计是在一个钢框架的基础上,由14个混凝土柱子支撑。
This paper introduces an unbonded post-tensioned grid slab floor system with a suspended mezzanine underneath for ventilation installations constructed by lift-slab method.
本文介绍一种新的结构体系——无粘结预应力井式梁板、悬挂技术夹层升板结构。
The concrete slab floor of the basement is covered with a protective coating, while cable guides, conduits and pipes remain visible, with corridors and changing rooms illuminated indirectly.
地下室的混凝土板楼由保护涂层覆盖,而电缆导管、导管和管道保持可见,走廊和更衣室都采用间接照明。
If that happens, slab pull could draw the oceanic crust under the continent, actually causing the Americas to move eastward toward Europe and the ocean floor to get smaller.
若果真如此,岩板拉力会将海洋地壳拖拽到大陆之下,实际上会使美洲大陆向东移动靠近欧洲,海床也会缩小。
These Spaces open up views across the office through circular oculi that create the largest possible openings in the floor slab while minimizing structural impact.
通过在楼层内板块构造的圆围尽可能地扩大开放空间,同时减少结构影响,这些空间开阔了办公室内部视野。
A concrete bench protrudes from the floor slab into the narrow garden.
一张水泥板凳从地板一直伸向狭窄的小花园。
While the concrete floor slab is the source of heat, it also serves as a heat sink in the winter months and helps keep the home cool during the summer.
混凝土楼层楼板是热源,同时在冬季的几个月里也是散热器,并在夏季保持室内凉爽。
First floor volume is made of a structure of reinforced concrete in pillars and slab in roof and enclosures, also made of honeycomb clay blocks.
二楼体量由柱子、屋顶平板和围墙中的钢筋混凝土结构构成,也用蜂窝粘土块建造。
In winter low-height sunshine passes into each room through gap of the layered 'brise-soleil', accumulate the heat into cement slab on the floor.
在冬季,阳光通过“遮阳板”连接层的缝隙进入每个房间,热量积聚在水泥板上。
The design of the upper floor mirrors the base, with voids in the roof slab corresponding with those in the floor plate below.
楼上的设计反应了底层,屋顶板的空隙与下方楼板的空隙相对应。
You can also consider using wood chips or gravel as a floor or even pour a concrete slab underneath.
您还能考虑使用木片或铺石渣作为地板甚至在底下倾吐一块混凝土板。
This paper analyzes the cause of civil-situ floor defect from the construction point of view, and put forward control measures to prevent casting slab defects.
文章分析了民用建筑现浇楼板缺陷产生的原因,着重从施工角度上提出了对现浇楼板产生缺陷的防治措施。
Locating the gym below ground, the architects are free to make an easily accessible welcome space at street level and put the sports area on the floor above, on the same level as the slab.
由于把体育室放到了地下层,建筑师便能够在首层轻易创造出易于接近的欢迎空间,并且把体育区放到与盖板一样的楼层之上。
Simple early form-removal system of floor slab structure is put forward considering the defects of traditional formwork.
结合楼板结构常规模板存在的缺陷,提出了简易早拆模板体系。
The concrete floor slab design of intersecting-beam system is the normal form in structural DE sign.
混凝土交叉梁系楼面结构是设计中最常用的楼面结构形式。
Ceramsite concrete sandwich floor slab is a type of composite floor slab, which is made of profiled sheet and ceramsite concrete.
陶粒混凝土夹芯楼板是一种压型钢板与陶粒混凝土的组合楼板,其空腹部分采用聚苯乙烯板填充,是一种新型轻质节能板材。
The discrepancy between current design methods and actual structural behavior is due to the design methods ignoring membrane action of the floor slab.
现行设计方法和实际结构性能之间产生这种差异是由于设计方法中忽略了楼板的薄膜作用。
Through the analysis of the stress characteristics of the circular pipe cavity mushroom floor, this paper analyzes the calculating model and method of the floor slab.
通过分析圆管式空心无梁楼盖的受力特点,分析了此楼板体系的计算模型及计算方法。
Combining the author's years of work practice, the paper makes the comparison and analysis of the choice principle and types of high-rise steel structure floor slab for people's reference.
现结合笔者多年工作的实践经验,对目前多高层钢结构住宅楼板从选择原则、类型等方面进行了比较与分析,谨供大家作参考之用。
Beam and slab of RC floor system, which bear vertical load directly, act on each other and work together.
钢筋混凝土梁板体系中梁与楼板作为直接承担竖向荷载的构件,彼此之间相互作用,共同工作。
This structure has the advantages of lightening self-weight, strengthening floor slab rigidity, improving sound insulation and reducing structure cost.
此类结构具有减轻自重、增加楼板刚度、提高隔声效果和降低结构造价等优点。
Due to the large span of the floor slab, the moment torsion of the beam, under the vertical load, is obvious.
由于板跨较大,竖向荷载使梁截面承受的扭矩较大。
This paper analyses causations of precast floor slab crack in engineering from the aspects of design, material and construction.
本文从设计、材料、施工三方面,详细分析了工程中预制楼板板缝开裂的原因。
By reinforcing the composite concrete floor slab with structural steel plates, Arup optimized the structural system to meet the building's complex requirements.
为了满足建筑复杂的要求,阿拉普通过使用钢板加强组合楼板优化了结构体系。
The temperature effect of super-long concrete floor is so obvious that the tensile stress will easily lead to extensively slab crack.
超长连续混凝土板的温度效应十分显著,易造成楼板大开裂。
The temperature effect of super-long concrete floor is so obvious that the tensile stress will easily lead to extensively slab crack.
超长连续混凝土板的温度效应十分显著,易造成楼板大开裂。
应用推荐