Introduce a data structure of Two-dimensional Vector Workload to ensure Site-depth-first Searching Model and the time control of sites processing with weighted values.
提出二维矢量工作队列数据结构,保证站点深度优先搜索以及权值对站点处理时间的影响。
For the on-site model, a four-subband global structure of energy spectrum is shown clearly, but no obvious hierarchical trifurcation of each sub-band is found.
对于在位模型,谱结构是清晰的四子带全局结构,但每一子带未见明显的三分支结构。
Based on the super structure, a mixed integer non-linear programming (MINLP) model is established for total site energy integration.
基于此超结构,建立了全局能量集成的混合整数非线性规划模型,并用列队竞争算法进行求解。
When the stochastic seismic response of the structures is studied, lots of the earthquake records fit for the selected site are necessary to be used for initial data for structure model analysis.
在研究结构的随机地震反应时,要用大量的符合场地条件的地震记录作为输入数据。
When the stochastic seismic response of the structures is studied, lots of the earthquake records fit for the selected site are necessary to be used for initial data for structure model analysis.
在研究结构的随机地震反应时,要用大量的符合场地条件的地震记录作为输入数据。
应用推荐