• Passed the ISO9000 quality management system certification on-site audit, and so on.

    顺利通过ISO 9000质量管理体系现场认证审核等。

    youdao

  • Generally, the time since previous on-site audit of the original CB must be less than 12 months.

    原机构最近一次现场审核时间距离本次转机构复评审核时间,通常不得超过12个月。

    youdao

  • On site audit before held its first meeting, after the audit should be held at the end of the meeting.

    现场审核前要召开首次会议,审核后要召开末次会议。

    youdao

  • At present, the importance of off-site audit in audit analysis is analyzed, and an off-site audit method is proposed.

    分析了非现场审计在审计应用中的重要性,提出了一种实现非现场审计的方法。

    youdao

  • In the year 2014, on-site audit findings, customer satisfaction evaluation of client based entirely on questionnaire.

    年,现场审核发现,客户的顾客满意度评价完全基于调查表。

    youdao

  • Stage 2 - Site Audit: see ISO/IEC DIS 17021 Annex B. 6. For the initial audit, remote supporting functions shall be audited prior to the manufacturing site.

    阶段2:现场审核:ISO/IECDIS 17021附录B.6,对于初次审核,应该使外部支持活动的审核应该优先与生产现场的审核。

    youdao

  • Rectification shall be carried out according to the requirement on the non-conformity items discovered on the on-site audit and the corrective measures are effective;

    对现场审核中出现的不合格项能够按要求整改且纠正措施实施有效;

    youdao

  • To read audit entries from the current site collection you must start by creating an SPAuditQuery object and initializing it with an SPSite object.

    在从当前网站集中读取审计信息前,我们首先要创建一个SPAuditQuery对象,并用一个SPSite对象初始化它。

    youdao

  • The design and ongoing implementation and audit of roles and permissions should mirror the intent and requirements for your site.

    设计、后续实现和角色和权限的审计都应该贴近站点的意图和需求。

    youdao

  • Reading from the audit log is a restricted operation that requires site administrator permissions.

    需要注意,读取审计日志是一个受限制的操作,需要站点管理员权限。

    youdao

  • With ability of drawing audit; with preparation and audit ability of construction organization design& bidding; with good supervision and coordination ability of construction site steel structure.

    具备图纸审核能力;具备《施工组织设计》、《招投标》编制与审核能力、具备施工现场钢结构专业及其他专业督导和协调能力;

    youdao

  • NOTE 2: Ensure you review performance data (since the last audit) during the off-site pre-planning.

    注2:确保你在非现场审核策划时,评审自上次审核以来的绩效数据。

    youdao

  • This title will work in site of client and take charge for site safety audit and other jobs.

    本职位将工作在客户现场,负责现场安全审核及其它工作。

    youdao

  • Including standardized writing and audit, on-site quality control testing to help choose material corrosion inspections.

    包括规范撰写及审核、现场质量控制测试、帮助选择材料腐蚀勘察。

    youdao

  • Corporate Audit scheme: How the days are distributed between the site (s) and any supporting functions remote or not is the responsibility of the certification body.

    整体审核方案:怎样在现场和外部支持场所(或没有)间分配审核日是认证机构的责任。

    youdao

  • On-site factory audit is conducted according to SHAPR SHSPM audit requirements.

    工厂现场审核按照夏普shspm审核要求进行。

    youdao

  • Any changes to management system, scope or site location not included in audit report require Registration Committee Approval.

    没有包括在审核报告中的任何管理体系,范围或场所的变更应获得技术委员会的批准。

    youdao

  • On arrival, meet and greet key personnel. Receive update on company, meet company representatives 0participating in audit. Arrange programme, e. g. breaks, lunch (flexible time, but not off site).

    到达之后,会见并问候主要工作人员及参与审计的公司代表,了解公司最新概况。审计过程中安排的其他活动包括休息、工厂内的午餐等。

    youdao

  • On arrival, meet and greet key personnel. Receive update on company, meet company representatives 0participating in audit. Arrange programme, e. g. breaks, lunch (flexible time, but not off site).

    到达之后,会见并问候主要工作人员及参与审计的公司代表,了解公司最新概况。审计过程中安排的其他活动包括休息、工厂内的午餐等。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定