• This paper brings forward a new construction method that brick model has been used to replace wood model in blade feet part sinking well engineering.

    本文提出用砖模代替木模的方法用于沉井工程中刃脚部分的施工的理论。

    youdao

  • Summary: quicksand layer appears in the sinking and driving engineering will give well engineering excavation work caused a certain degree of interference, which can even lead to security incidents.

    论文发表网-摘要:井巷工程中出现流沙层,会给井巷工程的挖掘工作造成一定的干扰,严重时甚至会导致安全事故。

    youdao

  • Summary: quicksand layer appears in the sinking and driving engineering will give well engineering excavation work caused a certain degree of interference, which can even lead to security incidents.

    论文发表网-摘要:井巷工程中出现流沙层,会给井巷工程的挖掘工作造成一定的干扰,严重时甚至会导致安全事故。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定